Padstake
Menu

Oklahoma City, OK

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY. Included: water system development fee (5/8 inch meter), sewer development charge (2 bathrooms assumed), streets and parks development fees (2,000 sq ft heated assumed). Missing: building permit and plan review amount for new houses (the per-square-foot rate is not in the stored documents; the Permit Fees page accordion text did not load), meter purchase ($48.28) and inspection ($35) fees, contractor tap installation. Impact fees update each July 1; the pages fetched 2026-11-09 show no effective date, so the amounts may be the July 2025 or July 2026 schedule. Sources 277-280 (okc.gov). Lane A 2026-11-08.

Water/sewer provider: City of Oklahoma City

LinePrinted ratePrototypeReceipt
Water system development fee, 5/8 or 3/4-inch meter
water
$1,000
per meter, by size
$1,000Printed
Effective n/a
Source · Builders & Contractors page
fetched 2026-11-08, sha256 aa144f4b425f
Sewer system development charge
sewer · computed
$100 plus $50 per bathroom unit
base plus per bathroom
$200100 + 50 x 2 bathrooms (assumed) = 200
Effective n/a
Source · Builders & Contractors page, note
fetched 2026-11-08, sha256 aa144f4b425f
Streets development fee, residential (Rural and New Growth areas $0.47; Infill $0.40; Core $0.34 per sq ft)
transportation · computed
$0.47 per sq ft (highest area)
per sq ft excl. porches and garages
$9400.47 x 2,000 sq ft heated = 940.00
Effective n/a
Source · Development Impact Fees page
fetched 2026-11-08, sha256 d899311f3ce1
Parks development fee, residential
parks · computed
53 cents per sq ft
per sq ft excl. porches, garages, patios
$1,0600.53 x 2,000 sq ft heated = 1,060.00
Effective n/a
Source · Development Impact Fees page
fetched 2026-11-08, sha256 d899311f3ce1

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.