Moore, OK
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Included: transportation impact fee $900 per single-family lot, residential sewer impact fee $1,000 per unit, sewer user connection permit $50, 5/8-inch water meter standard set $250 (short set $575, long $1,000), residential new-home plan review $50 (City of Moore Schedule of Fees and Charges, March 2026). Not included: residential new building permit fee (printed as "10 sq. ft." with no decimal point or dollar sign, so the rate is ambiguous; not guessed), sanitary sewer lift station impact fee $700 per unit (applies only where a lift station serves the lot, not shown as universal), water service/hookup charges of $30, state Uniform Building Code Act fee $4.50, trade permits. No water impact fee is posted. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Moore
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Transportation impact fee, single-family R-1 impact | $900.00 per lot | $900 | Printed Effective 2026-03-01 Source · City of Moore Schedule of Fees and Charges, March 2026, Transportation Impact Fee Schedule (12-613) fetched 2026-11-09, sha256 026fcdd0364c |
| Residential sewer impact fee sewer | $1,000.00 (outside city limits doubled) per unit | $1,000 | Printed (inside city) Effective 2026-03-01 Source · City of Moore Schedule of Fees and Charges, March 2026, Sewer Connection Permit, item 2 fetched 2026-11-09, sha256 026fcdd0364c |
| Sewer user connection permit sewer | $50.00 per connection | $50 | Printed Effective 2026-03-01 Source · City of Moore Schedule of Fees and Charges, March 2026, City Sewer Connection Permit, item 1 fetched 2026-11-09, sha256 026fcdd0364c |
| Water meter, 5/8-inch house meter, standard set water | $250.00 (short set $575.00, long set $1,000.00) per meter | $250 | Standard set printed; short/long sets are higher Effective 2026-03-01 Source · City of Moore Schedule of Fees and Charges, March 2026, H. Water Meters fetched 2026-11-09, sha256 026fcdd0364c |
| Plan review, residential new home permit | $50.00 per new home | $50 | Printed Effective 2026-03-01 Source · City of Moore Schedule of Fees and Charges, March 2026, Plan Review Fee fetched 2026-11-09, sha256 026fcdd0364c |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.