Padstake
Menu

Bixby, OK

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$2,480listed total
Nonerank by 2025 new single-family permits

Not included: Included: new single-family building permit $50, plan review $350 (2,000-2,499 sq ft tier; 2,000 sq ft assumed), total single-family inspection fees $1,180, water tap 3/4-inch $150, AMR meter 3/4-inch inside city limits $600, sewer tap $150 (City of Bixby FY27 Comprehensive Fee Schedule, July 1 2026). No per-dwelling impact fee is posted. Not included: sewer excess-capacity fees (charged per acre by drainage basin, $400 to $4,720 residential per acre), stormwater fee in lieu ($0.20-$0.21 per sq ft impervious in Fry/Haikey basins, where applicable), mechanical, electrical and plumbing trade permits ($79.50 each), refundable water meter deposit $100, backflow preventer $60, ODEQ fees. Searched 2026-11-09 (lane A, 2nd pass).

Water/sewer provider: City of Bixby

LinePrinted ratePrototypeReceipt
New single-family building permit fee
permit
$50.00
per dwelling
$50Printed (Residential Building Permit Fees, A, Single Family Homes)
Effective 2026-07-01
Source · FY27 Comprehensive Fee Schedule, residential building permit fees
fetched 2026-11-09, sha256 9a72ce00e2cc
New single-family plan review, 2,000-2,499 sq ft
permit
$350.00 (2,000 to 2,499 sq ft tier)
per dwelling, by total area
$350Tier for 2,000 sq ft (assumed) = 350
Effective 2026-07-01
Source · FY27 Comprehensive Fee Schedule, residential building permit fees
fetched 2026-11-09, sha256 9a72ce00e2cc
Single-family inspection fees (total, all required inspections)
permit
$1,180.00
per dwelling
$1,180Printed total of itemized inspections (incl. water and sewer line inspections)
Effective 2026-07-01
Source · FY27 Comprehensive Fee Schedule, section C Inspection Fees - Single Family homes
fetched 2026-11-09, sha256 9a72ce00e2cc
Water tap, 3/4-inch
water
$150.00
per tap, by size
$150Printed
Effective 2026-07-01
Source · FY27 Comprehensive Fee Schedule, section E (MEP) and tap fees
fetched 2026-11-09, sha256 9a72ce00e2cc
AMR water meter, 3/4-inch or less, inside city limits
water
$600.00 (outside city limits $2,500.00)
per meter, by size
$600Printed (inside city limits)
Effective 2026-07-01
Source · FY27 Comprehensive Fee Schedule, Utilities Fees, AMR meter charges
fetched 2026-11-09, sha256 9a72ce00e2cc
Sewer tap
sewer
$150.00
per tap
$150Printed
Effective 2026-07-01
Source · FY27 Comprehensive Fee Schedule, section E (MEP) and tap fees
fetched 2026-11-09, sha256 9a72ce00e2cc
Total listed$2,480

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.