Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$12,507.41listed total
Nonerank by 2025 new single-family permits

Not included: Warren County OH: water tap-in $5,000, sanitary sewer connection $5,500 (rules table dated 4/1/2024; a 2024 notice proposed later increases, not found adopted), 5/8-inch meter set $350, and the residential building fee sheet (building $100 + $3 per $1,000 of computed ICC valuation, electric and HVAC $100 + $1 per 100 sq ft on 2,400 sq ft, processing fee, CO, 1% state surcharge; sheet undated). Ohio has no impact fee here. NOT included: zoning fee ($250 for 961+ sq ft, from a separate zoning sheet), plumbing (health district), system capacity charge (applies only where another subdivision provides treatment), lateral inspection $150, project cost. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water tap-in charge, single family residential unit, 5/8 inch meter
water
$5,000.00
per single family residential unit
$5,000Printed
Effective 2024-04-01
Source · Warren County Water and Sewer Department Rules and Regulations, Section IX, Tap-In Charge
fetched 2026-11-09, sha256 6b8e15b0393f
Sanitary sewer connection charge, single family residential unit
sewer
$5,500.00
per single family residential unit
$5,500Printed
Effective 2024-04-01
Source · Warren County Water and Sewer Department Rules and Regulations, Section IX, Connection Charge
fetched 2026-11-09, sha256 6b8e15b0393f
Water meter set fee, 5/8 inch
water
$ 350.00
per meter (purchase and installation of meter only)
$350Printed
Effective 2024-04-01
Source · Warren County Water and Sewer Department Rules and Regulations, Section IX, Meter Set Fees, Section 8.01.A.3
fetched 2026-11-09, sha256 6b8e15b0393f
Processing fee
permit
$ 50.00
per application
$50Printed
Effective current
Source · Warren County Building Fees - Residential plus 1% state surcharge
fetched 2026-11-09, sha256 6ddd066c5a62
Building permit base plus valuation
permit · computed
$ 100.00 base, $3.00/$1,000 valuation
per $1,000 of valuation
$1,243ICC valuation $380,268 -> 381 thousands; 100.00 + 3.00 x 381 = 1,243
Effective current
Source · Warren County Building Fees - Residential plus 1% state surcharge
fetched 2026-11-09, sha256 6ddd066c5a62
Electric permit
permit · computed
$ 100.00 base, $1.00/100 SQ. FT.
per 100 sq ft
$124100.00 + 1.00 x 24 (2,400 sq ft incl. garage) = 124
Effective current
Source · Warren County Building Fees - Residential plus 1% state surcharge
fetched 2026-11-09, sha256 6ddd066c5a62
HVAC permit
permit · computed
$ 100.00 base, $1.00/100 SQ. FT.
per 100 sq ft
$124100.00 + 1.00 x 24 (2,400 sq ft incl. garage) = 124
Effective current
Source · Warren County Building Fees - Residential plus 1% state surcharge
fetched 2026-11-09, sha256 6ddd066c5a62
Certificate of occupancy
permit
$ 100.00
per dwelling
$100Printed
Effective current
Source · Warren County Building Fees - Residential plus 1% state surcharge
fetched 2026-11-09, sha256 6ddd066c5a62
State surcharge (1%)
permit · computed
1%
percent of permit fees
$16.411% x (50 + 1243 + 124 + 124 + 100) = 16.41
Effective current
Source · Warren County Building Fees - Residential plus 1% state surcharge
fetched 2026-11-09, sha256 6ddd066c5a62
Total listed$12,507.41

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.