Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified: water capacity charge 3/4-inch tap $1,890, sewer capacity charge $2,210 plus Columbus sewer capacity $3,044 and Dublin inspection fee $175 (total due to the City of Dublin for sewer $5,429), from the City of Dublin 2025 Water/Sewer Fee Schedule A. Not included: City of Columbus water capacity charges (billed by Columbus, not posted here), building permit fee (the 2023 residential fee sheet lists only plumbing $70 first fixture + $20 each additional, sanitary sewer inspection $150 and other service fees, no new-house permit rate), tap installation costs. This page never shows a total. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Dublin
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capacity charge, domestic, 3/4-inch tap (collected by Dublin; excludes Columbus water capacity) impact | $1,890.00 per tap | $1,890 | Printed Effective 2025-01-01 Source · City of Dublin OH 2025 Water/Sewer Fee Schedule A (capacity charges collected by the City of Dublin), 3/4-inch tap, Water Capacity Charges fetched 2026-11-09, sha256 c748204d10e7 |
| Dublin sewer capacity charge, 3/4-inch tap impact | $2,210.00 per tap | $2,210 | Printed Effective 2025-01-01 Source · City of Dublin OH 2025 Water/Sewer Fee Schedule A (capacity charges collected by the City of Dublin), 3/4-inch tap, Sewer Capacity Charges fetched 2026-11-09, sha256 c748204d10e7 |
| Columbus sewer capacity charge collected by Dublin, 3/4-inch tap impact | $3,044.00 per tap | $3,044 | Printed Effective 2025-01-01 Source · City of Dublin OH 2025 Water/Sewer Fee Schedule A (capacity charges collected by the City of Dublin), 3/4-inch tap, Sewer Capacity Charges fetched 2026-11-09, sha256 c748204d10e7 |
| Dublin sewer inspection fee, 3/4-inch tap sewer | $175.00 per tap | $175 | Printed Effective 2025-01-01 Source · City of Dublin OH 2025 Water/Sewer Fee Schedule A (capacity charges collected by the City of Dublin), 3/4-inch tap, Sewer Capacity Charges fetched 2026-11-09, sha256 c748204d10e7 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.