Cincinnati, OH
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified only, one sewer tap fee. Included: Metropolitan Sewer District of Greater Cincinnati sewer tap permit fee for a domestic meter up to 3/4 inch, effective Jan 1 2026. Missing: Greater Cincinnati Water Works tap and meter fees, City of Cincinnati building permit and plan review fees, sewer assessments and connection charges set by the Board of County Commissioners, stormwater connection permit. Searched 2026-11-09.
Water/sewer provider: MSD of Greater Cincinnati (sewer)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer tap permit fee, domestic water meter up to 3/4 inch sewer | $5,900 per sewer tap by meter size | $5,900 | Printed first column of the fee schedule (meter size up to 3/4 inch); the $480 single-family amount applies only to septic-to-sewer conversion permits Effective 2026-01-01 Source ยท MSD of Greater Cincinnati 2026 Sewer Tap Permit Fees (effective January 1, 2026), Sewer Tap Permit Fee fetched 2026-11-09, sha256 37b07e183e28 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.