Padstake
Menu

Reno, NV

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES ONLY. Included: Reno sewer connection fee for a single-family dwelling up to 31 fixture units at the highest printed service area (FY26/27 schedule, adjusted by CPI each July 1). No total is shown. Missing: water (Truckee Meadows Water Authority facility charges and meter fees not read), regional road impact fee (RTC), police facility impact fee (2020 manual shows $125; not in the current schedule). The city building permit is posted (valuation table: $1,139.30 + $6.20 per $1,000 over $100,000; plan review 65%; city ICC valuation table matches the Padstake standard, R-3 V-B 175.92) but is not loaded because water is missing. Sewer line new permit $45. Searched 2026-11-09.

Water/sewer provider: City of Reno (sewer); Truckee Meadows Water Authority (water)

LinePrinted ratePrototypeReceipt
Sewer connection fee, single-family dwelling up to 31 fixture units (Lawton-Verdi/TMWRF)
sewer
$15,946.00
per dwelling
$15,946Printed; highest printed service area; TMWRF $13,115.00, RSWRF $13,010.00. Rivermount adds $25,542.00 in that area
Effective 2026-07-01
Source ยท City of Reno Adopted Fees and Charges FY 26/27 (7/01/2026), Utility Services - Sewer Connection Fees
fetched 2026-11-09, sha256 889773b69abc

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.