Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES ONLY. Included: City sewer connection $3,235 (1 ERU, eff. 1/1/2026), traffic signal impact fee $195, residential construction tax (park) 1% of assumed valuation, LVVWD/SNWA regional connection $7,998, LVVWD facilities connection $2,371, LVVWD service installation $1,177 (5/8-inch; the district notes 5/8-inch meters may be withdrawn, larger meter costs more). Missing: City building permit and plan review fees (only the 2020 Building and Safety fee tables are posted, src 286, not used), LVVWD application fee and meter (at cost), Clark County transportation tax $1,000 per dwelling and Desert Conservation $550/acre + $58 (listed on the estimator page, not included). Searched 2026-11-09.

Water/sewer provider: City of Las Vegas (sewer); Las Vegas Valley Water District and SNWA (water)

LinePrinted ratePrototypeReceipt
Sewer connection charge, single-family dwelling (1.00 ERU)
sewer
$3,235
per dwelling unit (1.00 ERU x $3,235)
$3,235Printed: ERU $3,235 effective 1/1/2026; single-family = 1.00 ERU (2025 table, src 284)
Effective 2026-01-01
Source · Permit Fee Estimator page (Additional Fees list)
fetched 2026-11-08, sha256 3eca7e04499c
Traffic signal impact fee, single dwelling
transportation
$195
per single dwelling
$195Printed
Effective 2026-01-01
Source · Permit Fee Estimator page (Additional Fees list)
fetched 2026-11-08, sha256 3eca7e04499c
Residential Construction Tax (park fees)
parks · computed
1% of construction valuation
percent of valuation
$3,802.681% x $380,268 valuation (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) = $3,802.68; habitable space only
Effective 2026-01-01
Source · Permit Fee Estimator page (Additional Fees list)
fetched 2026-11-08, sha256 3eca7e04499c
SNWA Regional Connection Charge, residential 5/8-inch meter
water
$7,998
per meter, 3/1/2026
$7,998Printed; 8 or fewer units per acre
Effective 2026-01-01
Source · LVVWD Service Rules Appendix I, Table A.18.a
fetched 2026-11-08, sha256 2b0ac027adfb
LVVWD Facilities Connection Charge, 5/8-inch meter
water
$2,371
per meter, 3/1/2026
$2,371Printed
Effective 2026-01-01
Source · LVVWD Service Rules Appendix I, Table A.3.b
fetched 2026-11-08, sha256 2b0ac027adfb
LVVWD service connection installation, 5/8 x 3/4-inch, excluding meter
water
$1,177
per service
$1,177Printed (standard service; meter itself at cost)
Effective 2026-01-01
Source · LVVWD Service Rules Appendix I, Table A.3.f
fetched 2026-11-08, sha256 2b0ac027adfb

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.