Los Lunas village, NM
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Impact fees verified from the May 01 2026 Development Process Manual (Appendix B figures are images, transcribed into the stored .txt; original kept as .bak-orig): water $2,798 and sewer $2,297 for a 3/4-inch meter, each at 75% for single-family, parks $1,574 per dwelling at 100%. Missing: water and sewer service connection fees ("see Appendix B" but not listed there; an older undated impact/connection table, src 1292, shows $435 water and $150 sewer with superseded impact amounts), building permit fees (issued by the New Mexico Construction Industries Division, not the Village), so no total. Searched 2026-11-09 (lane A).
Water/sewer provider: Village of Los Lunas
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water impact fee, 3/4-inch meter, residential single family (75% of $2,798) water · computed | $2,798 x 75% (Residential, Single Family) per meter, by size | $2,098.50 | 2,798 x 75% = 2,098.50 Effective 2026-05-01 Source · Los Lunas Development Process Manual (May 01, 2026), Appendix B Figures 3 and 5 (transcribed) fetched 2026-11-09, sha256 4c14f6b709e9 |
| Sewer impact fee, 3/4-inch meter, residential single family (75% of $2,297) sewer · computed | $2,297 x 75% (Residential, Single Family) per meter, by size | $1,722.75 | 2,297 x 75% = 1,722.75 Effective 2026-05-01 Source · Los Lunas Development Process Manual (May 01, 2026), Appendix B Figures 3 and 5 (transcribed) fetched 2026-11-09, sha256 4c14f6b709e9 |
| Parks impact fee, per dwelling unit (single family 100%) parks | $1,574 per dwelling unit per dwelling unit | $1,574 | Printed; single family pays 100% Effective 2026-05-01 Source · Los Lunas Development Process Manual (May 01, 2026), Appendix B Figures 4 and 5 (transcribed) fetched 2026-11-09, sha256 4c14f6b709e9 |
| Plan review, residential new construction permit | $50 per plan | $50 | Printed Effective 2026-05-01 Source · Los Lunas Development Process Manual (May 01, 2026), Appendix E Fee Schedule (transcribed) fetched 2026-11-09, sha256 4c14f6b709e9 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.