PadstakeFeesMoratoriaMethodologyPricing

Winston-Salem, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$4,695listed total
60rank by 2025 new single-family permits

Not included: water meter equipment (AMI meter $79 non-remote or $325 remote plus $75 endpoint; which applies to a new home is not stated), water tap/sewer connection construction by the city or a contractor, gas appliance permit ($100 if gas), sales tax, and Forsyth County/Winston-Salem planning and erosion-control fees tied to the lot. Building square footage is assumed to be 2,400 (heated plus garage). Winston-Salem charges no impact fees; the water and sewer system development fees are the capacity charges.

Water/sewer provider: City of Winston-Salem

LinePrinted ratePrototypeReceipt
Building permit, new single-family residential
permit · computed
$0.15 per sq ft
per square foot of building
$3602,400 sq ft (2,000 heated + 400 garage, assumed all counted as building square footage) x $0.15 = $360.00
Effective 2026-04-01
Source · Building Fees, Single-family new residential (square foot)
fetched 2026-11-07, sha256 7f1641c807c3
Electrical permit, new single-family residential
permit · computed
$0.09 per sq ft
per square foot of building
$2162,400 sq ft (2,000 heated + 400 garage, assumed all counted as building square footage) x $0.09 = $216.00
Effective 2026-04-01
Source · Building Fees, Single-family new residential (square foot)
fetched 2026-11-07, sha256 7f1641c807c3
Plumbing permit, new single-family residential
permit · computed
$0.09 per sq ft
per square foot of building
$2162,400 sq ft (2,000 heated + 400 garage, assumed all counted as building square footage) x $0.09 = $216.00
Effective 2026-04-01
Source · Building Fees, Single-family new residential (square foot)
fetched 2026-11-07, sha256 7f1641c807c3
Mechanical permit, new single-family residential
permit · computed
$0.09 per sq ft
per square foot of building
$2162,400 sq ft (2,000 heated + 400 garage, assumed all counted as building square footage) x $0.09 = $216.00
Effective 2026-04-01
Source · Building Fees, Single-family new residential (square foot)
fetched 2026-11-07, sha256 7f1641c807c3
Homeowners' Recovery Fund fee, new single-family permit
permit
$10.00
per new single-family permit (NC licensed contractors)
$10Printed
Effective 2026-04-01
Source · Building Fees footnote
fetched 2026-11-07, sha256 7f1641c807c3
Water system development fee, 5/8" or 3/4" meter, FY2026-27
water
$816
per meter, by size
$816Printed
Effective 2026-07-01
Source · System Development Fee Schedule, FY 2026-27
fetched 2026-11-07, sha256 158643697c68
Wastewater system development fee, 5/8" or 3/4" meter, FY2026-27
sewer
$2,861
per meter, by size
$2,861Printed
Effective 2026-07-01
Source · System Development Fee Schedule, FY 2026-27
fetched 2026-11-07, sha256 158643697c68
Total listed$4,695