Padstake
Menu

Sanford, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Sanford NC: water ($1,146.77) and wastewater ($1,823.14) system development fees for a 3/4-inch water / 4-inch sewer connection from the 2022 council notice (a later proposed budget lists them as unchanged), plus FY2026-27 residential building permit ($0.20 per sq ft on 2,400 sq ft), electrical and plumbing permits. NC has no impact fee. NOT included: water tap and sewer tap amounts (2022 notice $950 and $1,250; FY2025-26 proposed budget $1,350 and $1,750, adoption not confirmed), mechanical permit, 3+ bath surcharge, plan review, parcels outside the city utility. Page never shows a total. 2026-11-09 second pass.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water system development fee, 3/4 inch meter
water
$1,146.77
per new water connection, 3/4 inch
$1,146.77Printed
Effective 2022-09-01
Source · City of Sanford news item: City Council Approves System Development Fees (effective September 1, 2022), example 3/4-inch water and 4-inch sewer
fetched 2026-11-09, sha256 835514439ab5
Wastewater system development fee, 4 inch sewer tap (3/4 inch water meter)
sewer
$1,823.14
per new wastewater connection
$1,823.14Printed
Effective 2022-09-01
Source · City of Sanford news item: City Council Approves System Development Fees (effective September 1, 2022), example 3/4-inch water and 4-inch sewer
fetched 2026-11-09, sha256 835514439ab5
Building permit, residential single-family dwelling
permit · computed
.20¢ per square foot + Cost of each trade
per sq ft, minimum $60.00
$480$0.20 x 2,400 sq ft = 480.00
Effective 2026-07-01
Source · Sanford Building Construction Fee Schedule 2026 - 2027, Building Permit Fees Residential
fetched 2026-11-09, sha256 06b9a37a7511
Electrical permit, residential new (up to 200 amps)
permit
Basic Fee $135.00 (up to 200 Amps)
per dwelling, 200 amp service assumed
$135Printed
Effective 2026-07-01
Source · Sanford Building Construction Fee Schedule 2026 - 2027, Electrical Permit Fees
fetched 2026-11-09, sha256 06b9a37a7511
Plumbing permit, residential new (includes 2 full baths)
permit
Basic Fee $100.00
per dwelling, includes 2 full baths or 1 full and 1 half bath
$100Printed
Effective 2026-07-01
Source · Sanford Building Construction Fee Schedule 2026 - 2027, Plumbing Permit Fees
fetched 2026-11-09, sha256 06b9a37a7511

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.