Rolesville, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Rolesville FY2026-27 adopted budget Schedule of Fees (src 1820, read 2026-11-13; rolesvillenc.gov, sent by the Town Planning Director): transportation development fee $3,200 and recreation development fee $3,200 per single-family unit, zoning permit $150, building permit processing $100, infrastructure inspection $200 per lot. Water and sewer system development fees are Raleigh Water's (schedule says "Per City of Raleigh"; Rolesville is a Raleigh Water merger community, Raleigh Development Fee Guide src 15 p.27, p.34): water capital facility $2,171 and sewer capital facility $3,335 for a 3/4-inch meter. Not included: Wake County building, plumbing, electrical and mechanical permits (not read), water and sewer taps and meter set, solid waste, school fees.
Water/sewer provider: Town of Rolesville (transportation, recreation development fees); Raleigh Water (water, sewer capital facility fees)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Transportation development fee, single and two-family dwellings, per unit transportation | $3,200 /unit per unit | $3,200 | Printed; one dwelling, lots in corporate limits or ETJ; due at permit approval Effective 2026-07-01 Source · p.88 (budget p.86) fetched 2026-11-13, sha256 4562ba465c5c |
| Recreation development fee, all other residential uses (single-family), per unit parks | $3,200 /unit per unit | $3,200 | Printed; one dwelling; senior multi-family is $1,000 per unit; due at permit approval Effective 2026-07-01 Source · p.88 (budget p.86) fetched 2026-11-13, sha256 4562ba465c5c |
| Zoning permit, new residential permit | $150 each | $150 | Printed Effective 2026-07-01 Source · p.87 fetched 2026-11-13, sha256 4562ba465c5c |
| Building permit processing, residential permit | $100 each | $100 | Printed Effective 2026-07-01 Source · p.87 fetched 2026-11-13, sha256 4562ba465c5c |
| Infrastructure inspection, single-family residential right of way improvement permit | $200 /lot per lot | $200 | Printed; one lot Effective 2026-07-01 Source · p.87 fetched 2026-11-13, sha256 4562ba465c5c |
| Water Capital Facility fee, 3/4-inch water meter (Raleigh Water) water | $2,171.00 per tap per tap, by meter size | $2,171 | Printed in the Raleigh guide; Rolesville is a Raleigh Water merger community and the town schedule says utility system development fees are "Per City of Raleigh" Effective 2026-07-01 Source · p.34 fetched 2026-11-06, sha256 1f6ad9b439af |
| Sewer Capital Facility fee, 3/4-inch water meter (Raleigh Water) sewer | $3,335.00 per tap per tap, by meter size | $3,335 | Printed in the Raleigh guide; Rolesville is a Raleigh Water merger community Effective 2026-07-01 Source · p.34 fetched 2026-11-06, sha256 1f6ad9b439af |
Fee-change calendar
- None recorded
Tell me when Rolesville is complete
Leave a work email. Your signup is stored now; nothing is emailed.