PadstakeGet the fee reports
Menu

Rolesville, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
142rank by 2025 new single-family permits

Impact fees verified. Not a full total. Rolesville FY2026-27 adopted budget Schedule of Fees (src 1820, read 2026-11-13; rolesvillenc.gov, sent by the Town Planning Director): transportation development fee $3,200 and recreation development fee $3,200 per single-family unit, zoning permit $150, building permit processing $100, infrastructure inspection $200 per lot. Water and sewer system development fees are Raleigh Water's (schedule says "Per City of Raleigh"; Rolesville is a Raleigh Water merger community, Raleigh Development Fee Guide src 15 p.27, p.34): water capital facility $2,171 and sewer capital facility $3,335 for a 3/4-inch meter. Not included: Wake County building, plumbing, electrical and mechanical permits (not read), water and sewer taps and meter set, solid waste, school fees.

Water/sewer provider: Town of Rolesville (transportation, recreation development fees); Raleigh Water (water, sewer capital facility fees)

LinePrinted ratePrototypeReceipt
Transportation development fee, single and two-family dwellings, per unit
transportation
$3,200 /unit
per unit
$3,200Printed; one dwelling, lots in corporate limits or ETJ; due at permit approval
Effective 2026-07-01
Source · p.88 (budget p.86)
fetched 2026-11-13, sha256 4562ba465c5c
Recreation development fee, all other residential uses (single-family), per unit
parks
$3,200 /unit
per unit
$3,200Printed; one dwelling; senior multi-family is $1,000 per unit; due at permit approval
Effective 2026-07-01
Source · p.88 (budget p.86)
fetched 2026-11-13, sha256 4562ba465c5c
Zoning permit, new residential
permit
$150
each
$150Printed
Effective 2026-07-01
Source · p.87
fetched 2026-11-13, sha256 4562ba465c5c
Building permit processing, residential
permit
$100
each
$100Printed
Effective 2026-07-01
Source · p.87
fetched 2026-11-13, sha256 4562ba465c5c
Infrastructure inspection, single-family residential right of way improvement
permit
$200 /lot
per lot
$200Printed; one lot
Effective 2026-07-01
Source · p.87
fetched 2026-11-13, sha256 4562ba465c5c
Water Capital Facility fee, 3/4-inch water meter (Raleigh Water)
water
$2,171.00 per tap
per tap, by meter size
$2,171Printed in the Raleigh guide; Rolesville is a Raleigh Water merger community and the town schedule says utility system development fees are "Per City of Raleigh"
Effective 2026-07-01
Source · p.34
fetched 2026-11-06, sha256 1f6ad9b439af
Sewer Capital Facility fee, 3/4-inch water meter (Raleigh Water)
sewer
$3,335.00 per tap
per tap, by meter size
$3,335Printed in the Raleigh guide; Rolesville is a Raleigh Water merger community
Effective 2026-07-01
Source · p.34
fetched 2026-11-06, sha256 1f6ad9b439af

Fee-change calendar

Tell me when Rolesville is complete

Leave a work email. Your signup is stored now; nothing is emailed.