Raleigh, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$24,142.46listed total
64rank by 2025 new single-family permits

Not included: Excluded: 3/4-inch meter charge (guide prints 5/8, 1, 1.5, 2 inch only), lot-dependent grading permit ($100 one-unit dwelling), street/driveway and fire fees. Open space zone rule: highest zone.

Water/sewer provider: Raleigh Water (City of Raleigh)

LinePrinted ratePrototypeReceipt
New residential building permit fee
permit · computed
0.38% of calculated construction value
percent of valuation
$1,265.84Valuation = (2,000 sq ft x $175.92 R-3 V-B + 400 sq ft garage x $71.07 U V-B) x (1 - 12.4% regional adjustment, p.57) = $333,114.77; construction type V-B assumed; x 0.38% = 1,265.84
Effective 2026-07-01
Source · p.16
fetched 2026-11-06, sha256 1f6ad9b439af
New residential plan review fee
permit · computed
57% of calculated building permit
percent of building permit fee
$721.5357% x 1,265.84 = 721.53
Effective 2026-07-01
Source · p.16
fetched 2026-11-06, sha256 1f6ad9b439af
New residential plumbing permit fee
permit · computed
34% of calculated building permit
percent of building permit fee
$430.3934% x 1,265.84 = 430.39
Effective 2026-07-01
Source · p.16
fetched 2026-11-06, sha256 1f6ad9b439af
New residential electrical permit fee
permit · computed
49% of calculated building permit
percent of building permit fee
$620.2649% x 1,265.84 = 620.26
Effective 2026-07-01
Source · p.16
fetched 2026-11-06, sha256 1f6ad9b439af
New residential mechanical permit fee
permit · computed
28% of calculated building permit
percent of building permit fee
$354.4428% x 1,265.84 = 354.44
Effective 2026-07-01
Source · p.16
fetched 2026-11-06, sha256 1f6ad9b439af
Sewer Capital Facility fee, 3/4-inch water meter
sewer
$3,335.00 per tap
per tap, by meter size
$3,335Printed
Effective 2026-07-01
Source · p.34
fetched 2026-11-06, sha256 1f6ad9b439af
Water Capital Facility fee, 3/4-inch water meter
water
$2,171.00 per tap
per tap, by meter size
$2,171Printed
Effective 2026-07-01
Source · p.34
fetched 2026-11-06, sha256 1f6ad9b439af
Water service installation (tap), 3/4-inch
water
$5,756.00 lump sum
lump sum
$5,756Printed
Effective 2026-07-01
Source · p.35
fetched 2026-11-06, sha256 1f6ad9b439af
Sewer service installation (tap), 4-inch
sewer
$5,155.00 lump sum
lump sum
$5,155Printed
Effective 2026-07-01
Source · p.35
fetched 2026-11-06, sha256 1f6ad9b439af
Thoroughfare fee, single family 2,000-2,999 sq ft
transportation
$2,417.00 per unit
per unit, by heated sq ft
$2,4172,000 sq ft heated falls in the 2,000-2,999 band
Effective 2026-07-01
Source · p.39
fetched 2026-11-06, sha256 1f6ad9b439af
Open space fee, single-family dwelling (highest zone, Zones 1 and 2)
parks · computed
$1,916.00 per unit (Zone 3 $1,615; Zone 4 $1,621)
per unit, by zone
$1,916Rule: zone depends on lot location; highest printed zone rate used and range shown
Effective 2026-07-01
Source · p.13
fetched 2026-11-06, sha256 1f6ad9b439af
Total listed$24,142.46