Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. System development fees verified from the Pender County Utilities Fee Schedule marked FY 2025-2026 (the posted schedule; a newer FY2026-27 sheet may exist): water $3,432 and sewer $7,107 per 3/4-inch meter, plus the 3/4-inch water tap fee $1,925. North Carolina counties have no development impact fee. NOT included: building permit and trade permit fees (Inspections schedule not found; search shows zoning permit $25 and stand-alone trade permits $75 from the FY2024-25 budget ordinance), sewer tap (not listed), meter-only fee $400, $50 service initiation inspection, parcels served by other districts. Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development fee water | $3,432.00 per 3/4 inch meter | $3,432 | Printed Effective 2025-07-01 Source · Pender County Utilities Fee Schedule FY 2025-2026, 3/4 inch meter fetched 2026-11-09, sha256 cc2682486b4d |
| Sewer system development fee sewer | $7,107.00 per 3/4 inch meter | $7,107 | Printed Effective 2025-07-01 Source · Pender County Utilities Fee Schedule FY 2025-2026, 3/4 inch meter fetched 2026-11-09, sha256 cc2682486b4d |
| Water tap fee water | $1,925.00 per 3/4 inch meter tap | $1,925 | Printed Effective 2025-07-01 Source · Pender County Utilities Fee Schedule FY 2025-2026, 3/4 inch meter fetched 2026-11-09, sha256 cc2682486b4d |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.