Padstake
Menu

Onslow County Unincorporated Area, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
70rank by 2025 new single-family permits

Impact fees verified. Not a full total. Onslow County NC (ONWASA service area): FY2027 system development fees for a 3/4-inch meter (water $2,063, sewer $4,460). NC has no county impact fee. NOT included: water and 4-inch sewer tap installation (posted as cost plus 10%, no amount), tap inspection $150 per site, deposits, county building permit fees (the county site onslowcountync.gov returns 403 to our agent, closed), municipal service areas (Jacksonville, Richlands, etc.). Page never shows a total. 2026-11-09 second pass.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water system development fee, 3/4 inch meter
water
$2,063
per 3/4 inch meter
$2,063Printed
Effective 2026-07-01
Source · ONWASA Fiscal Year 2026-2027 Rate and Fee Schedule (effective July 1, 2026), VII. System Development Fees, 3/4 inch meter
fetched 2026-11-09, sha256 0a12aa838ad0
Sewer system development fee, 3/4 inch meter
sewer
$4,460
per 3/4 inch meter
$4,460Printed
Effective 2026-07-01
Source · ONWASA Fiscal Year 2026-2027 Rate and Fee Schedule (effective July 1, 2026), VII. System Development Fees, 3/4 inch meter
fetched 2026-11-09, sha256 0a12aa838ad0

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.