Moore County Unincorporated Area, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Moore County NC (county water and sewer service): FY 2026/2027 connection fees for a 3/4-inch meter: water tap $1,197 + SDF $1,573 + meter service fee $450 + admin $50 = $3,270, sewer tap $1,576 + SDF $2,414 + admin $50 = $4,040. NC has no county impact fee. NOT included: East Moore Water District (separate fee schedule), county building/inspection permit fees (not read), taps deeper than 8 ft (cost), repair fees. Page never shows a total. 2026-11-09 second pass.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap fee, 3/4 inch meter water | $1,197 per 3/4 inch meter (developer-installed connections do not pay the tap portion) | $1,197 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Water Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
| Water system development fee (SDF), 3/4 inch meter water | $1,573 per 3/4 inch meter | $1,573 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Water Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
| Water meter service fee (MSF), 3/4 inch meter water | $450 per 3/4 inch meter | $450 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Water Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
| Water connection admin fee water | $50 per connection | $50 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Water Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
| Sewer tap fee, 3/4 inch meter sewer | $1,576 per connection | $1,576 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Sewer Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
| Sewer system development fee (SDF), 3/4 inch meter sewer | $2,414 per connection | $2,414 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Sewer Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
| Sewer connection admin fee sewer | $50 per connection | $50 | Printed Effective 2026-07-01 Source · Moore County Public Utilities Division Fee Schedule FY 2026/2027 (in the Tap Application), Connection Fees, 3/4 inch meter, Sewer Connection Fees fetched 2026-11-09, sha256 c6489199f82f |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.