Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$11,926.21listed total
114rank by 2025 new single-family permits

Not included: Lincoln County FY2025-26 fee schedule (a FY2026-27 water/sewer sheet reportedly shows the same 3/4-inch system development fees $3,593 and $1,788): 3/4-inch water tap and meter, water and sewer system development fees, 4-inch gravity sewer tap, and single-family new-construction permits per sq ft (2,000 heated). North Carolina has no impact fee; none listed. Not included: irrigation taps, deposits, parcels in Lincolnton/Denver or served by other utilities, "out-of-county" rates, plan review, zoning permit. Staged 2026-11-09.

Water/sewer provider: Lincoln County Utilities

LinePrinted ratePrototypeReceipt
Residential water tap fee, 3/4 inch
water
1,280
per 3/4 inch tap
$1,280Printed
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Water and Sewer, Table 1
fetched 2026-11-09, sha256 fd14c881b294
Water meter fee, 3/4 inch
water
265
per 3/4 inch meter
$265Printed
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Water and Sewer, Table 1
fetched 2026-11-09, sha256 fd14c881b294
Water system development fee, 3/4 inch
water
3,592.80
per 3/4 inch water connection
$3,592.80Printed
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Water and Sewer, Table 2
fetched 2026-11-09, sha256 fd14c881b294
Sewer tap, 4-inch gravity
sewer
4,000
per 4 inch gravity tap
$4,000Printed
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Water and Sewer, Table 4
fetched 2026-11-09, sha256 fd14c881b294
Sewer system development fee, 3/4 inch meter
sewer
1,788.41
per sewer connection (by water meter size)
$1,788.41Printed
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Water and Sewer, Table 5
fetched 2026-11-09, sha256 fd14c881b294
Single-family new construction permit - building
permit · computed
$0.35/sq ft (minimum $100.00)
per sq ft
$700$0.35 x 2,000 sq ft heated (assumed) = 700.00
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Planning and Inspections, Residential Construction
fetched 2026-11-09, sha256 fd14c881b294
Single-family new construction permit - electrical
permit · computed
$0.05/sq ft (minimum $75.00)
per sq ft
$100$0.05 x 2,000 sq ft heated (assumed) = 100.00
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Planning and Inspections, Residential Construction
fetched 2026-11-09, sha256 fd14c881b294
Single-family new construction permit - mechanical
permit · computed
$0.05/sq ft (minimum $75.00)
per sq ft
$100$0.05 x 2,000 sq ft heated (assumed) = 100.00
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Planning and Inspections, Residential Construction
fetched 2026-11-09, sha256 fd14c881b294
Single-family new construction permit - plumbing
permit · computed
$0.05/sq ft (minimum $75.00)
per sq ft
$100$0.05 x 2,000 sq ft heated (assumed) = 100.00
Effective 2025-07-01
Source · Lincoln County Fees & Charges Fiscal Year 2025-2026, Planning and Inspections, Residential Construction
fetched 2026-11-09, sha256 fd14c881b294
Total listed$11,926.21

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.