Jacksonville, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY, no total. Jacksonville NC: included = residential water system development fee 2,915 and sewer system development fee 3,255 (Schedule B, effective Aug 1 2024, printed in the FY 2026-27 schedule), residential new structure permit 0.52 per sq ft on 2,000 sq ft (1,040; includes building and trades) and 5% technology fee. MISSING: water and sewer service line installation (cost plus 10% on request, not posted) and water meter price (market price). NOT included: meter-only fee ($50 to $100 plus market price), Onslow County and school fees, service area assessments (Schedule C, areas only). 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development fee, residential water | $2,915.00 per residential unit (meter costs not included) | $2,915 | Printed Effective 2024-08-01 Source · Jacksonville NC FY 2026-2027 Fee Schedules (effective July 1 2026), Water and Sewer System Development Fee Schedule B, Residential (effective Aug 1 2024) fetched 2026-11-09, sha256 2a1290aafea3 |
| Sewer system development fee, residential sewer | $3,255.00 per residential unit (meter costs not included) | $3,255 | Printed Effective 2024-08-01 Source · Jacksonville NC FY 2026-2027 Fee Schedules (effective July 1 2026), Water and Sewer System Development Fee Schedule B, Residential (effective Aug 1 2024) fetched 2026-11-09, sha256 2a1290aafea3 |
| Residential new structure building permit (all trades) permit · computed | $.52 per square foot, $520.00 minimum 2,000 sq ft heated | $1,040 | 0.52 x 2,000 = 1040.00 Effective 2026-07-01 Source · Jacksonville NC FY 2026-2027 Fee Schedules (effective July 1 2026), Residential New Structures (B, E, P, M, FP) fetched 2026-11-09, sha256 2a1290aafea3 |
| Technology fee, residential permit · computed | 5% of permit fee ($5 minimum) 5% of building permit fee | $52 | 0.05 x 1040.00 = 52.00 Effective 2026-07-01 Source · Jacksonville NC FY 2026-2027 Fee Schedules (effective July 1 2026), technology fee fetched 2026-11-09, sha256 2a1290aafea3 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.