Holly Springs town, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Holly Springs FY2027 fee workbook (July 1, 2026 to June 30, 2027): 3/4-inch water and sewer system development fees, water meter, residential new dwelling permit (flat $1,200 up to 3,000 sq ft), recovery fee, 4% technology surcharge, engineering driveway and lot final inspections. NOT included: separate $75 trade permits (building/electrical/mechanical/plumbing: unclear whether they apply on top of the new-dwelling fee), parks fee in lieu of land dedication (UDO Chapter 4 tables 4.7A-C, depends on the plat), utility permit review fees, certificate of occupancy fee and developer-installed tap fees. North Carolina has no impact fee; none listed. Staged 2026-11-09.
Water/sewer provider: Town of Holly Springs
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development fee, 3/4 inch meter water | $6,162.00 per 3/4 inch meter (single family), due at building permit | $6,162 | Printed Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Residential Development Fees / System Development Fees fetched 2026-11-09, sha256 6e236f742418 |
| Sewer system development fee, 3/4 inch meter sewer | $5,538.00 per 3/4 inch meter (single family), due at building permit | $5,538 | Printed Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Residential Development Fees / System Development Fees fetched 2026-11-09, sha256 6e236f742418 |
| Water meter, 3/4 inch water | $355.00 per meter | $355 | Printed Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Water Meter Fees fetched 2026-11-09, sha256 6e236f742418 |
| Residential new dwelling permit permit | $1,200.00 up to 3,000 sq ft per dwelling unit, up to 3,000 sq ft | $1,200 | Printed (2,000-2,400 sq ft is within the band) Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Residential New Dwellings - Each Dwelling Unit fetched 2026-11-09, sha256 6e236f742418 |
| Homeowner's recovery fee permit | $10.00 per dwelling | $10 | Printed Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Residential New Dwellings - Each Dwelling Unit fetched 2026-11-09, sha256 6e236f742418 |
| Technology surcharge permit · computed | 4% of permit fee percent of permit fee | $48 | 4% x $1,200.00 = 48.00 Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), General Building Code Fees fetched 2026-11-09, sha256 6e236f742418 |
| Engineering inspection: driveway permit | $125 each per driveway | $125 | Printed Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Engineering Inspection Fees fetched 2026-11-09, sha256 6e236f742418 |
| Engineering inspection: lot or site final (prior to C.O.) permit | $200 each per lot | $200 | Printed Effective 2026-07-01 Source · Town of Holly Springs Fiscal Year 2027 Fee Workbook (July 1, 2026 - June 30, 2027), Engineering Inspection Fees fetched 2026-11-09, sha256 6e236f742418 |
| Total listed | $13,638 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.