Hoke County Unincorporated Area, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Hoke County 2025-2026 rate schedule prints "System Development Fee: $5,269.00; Water Tap: $2774.00; Sewer Tap: $2495.00"; the two taps add up to exactly $5,269.00, so they are shown as the connection charge and the $5,269.00 is not added again. Permits: county schedule effective 7/1/2024 (the schedule says the higher of the square-foot and graduated fee scale is used; the square-foot figure is shown, 2,400 sq ft heated + unheated). North Carolina has no impact fee; none listed. Not included: meter, deposits, parcels served by cities (Raeford) or other utilities. Staged 2026-11-09.
Water/sewer provider: Hoke County Public Utilities
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water tap (part of the $5,269.00 system development fee line) water | $2774.00 per residential connection | $2,774 | Printed Effective 2025-07-01 Source · Hoke County 2025-2026 Rate Schedule (System Development Fee line) fetched 2026-11-09, sha256 377526821f10 |
| Sewer tap (part of the $5,269.00 system development fee line) sewer | $2495.00 per residential connection | $2,495 | Printed Effective 2025-07-01 Source · Hoke County 2025-2026 Rate Schedule (System Development Fee line) fetched 2026-11-09, sha256 377526821f10 |
| Processing fee (non-refundable) permit | $200.00 Non-Refundable per permit | $200 | Printed Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Building permit permit · computed | $0.35/sq.ft. (heated/unheated) per sq ft | $840 | $0.35 x 2,400 sq ft (2,000 heated + 400 unheated garage) = 840.00 Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Electrical panel permit | $200.00 per dwelling | $200 | Printed Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Mechanical (HVAC) permit | $100.00 per dwelling (5 tons or less) | $100 | Printed Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Plumbing permit | $200.00 per dwelling per dwelling | $200 | Printed Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Insulation permit | $100.00 per dwelling per dwelling | $100 | Printed Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Residential recovery fee (NC general contractors) permit | $10.00 Fee per permit | $10 | Printed Effective 2024-07-01 Source · Hoke County Inspection Department Permit Fee Schedule effective 7/1/2024, New Construction/Residential fetched 2026-11-09, sha256 e101eb454d23 |
| Total listed | $6,919 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.