Padstake
Menu

Fayetteville, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. PWC water and sewer system development fees (3/4-inch) and the combination 1-inch water / 4-inch sewer laterals ($11,380) from the PWC rates page (May 1, 2026); building permit $0.30 per sq ft from the city FY26 permit schedule (2,000 sq ft heated assumed; plan review for a one- or two-family dwelling is free). NOT included: residential main connection charges ($2,480 water, $4,530 sewer; charged where the main is not yet connected/assessed), electrical/mechanical/plumbing permits (equipment-based), $30 connection charge, deposits. North Carolina has no impact fee; none listed. Page never shows a total. 2026-11-09.

Water/sewer provider: Fayetteville PWC

LinePrinted ratePrototypeReceipt
Water system development fee, 3/4 inch meter
water
$763
per 3/4 inch meter (excludes multi-family units)
$763Printed
Effective 2026-05-01
Source · Fayetteville PWC Residential Rates page (water and sewer fees effective May 1, 2026), System Development Fees
fetched 2026-11-09, sha256 1c552f1964b2
Sewer system development fee, 3/4 inch meter
sewer
$1,853
per 3/4 inch meter (excludes multi-family units)
$1,853Printed
Effective 2026-05-01
Source · Fayetteville PWC Residential Rates page (water and sewer fees effective May 1, 2026), System Development Fees
fetched 2026-11-09, sha256 1c552f1964b2
1 inch water and 4 inch sewer service laterals (combination)
water
$11,380
per combination connection
$11,380Printed (main connection charges $2,480 water / $4,530 sewer not added)
Effective 2026-05-01
Source · Fayetteville PWC Residential Rates page (water and sewer fees effective May 1, 2026), Combination Water & Sewer Laterals
fetched 2026-11-09, sha256 1c552f1964b2
New single-family building permit
permit · computed
$0.30 per sq. ft. (Min. $90.00)
per sq ft of the building
$600$0.30 x 2,000 sq ft heated (assumed; the schedule says "square footage of the building") = 600.00
Effective 2025-07-01
Source · City of Fayetteville Permitting & Inspection Division Fee Schedule FY26, Building Permits
fetched 2026-11-09, sha256 cd0f744ea284

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.