Elizabeth City, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Elizabeth City NC: water and wastewater system development fees (3/4 inch meter: 3,395 + 3,113), 3/4 inch water tap 1,150 and 4 inch sewer tap 1,150, building permit on computed valuation $380,268 ($100 first $1,000 + $10 per $1,000 rounded up = 3,900) and the $10 homeowners recovery fee, from the FY 2026-2027 Fee Schedule posted as Final (header date is a 00/00/00 placeholder; the council hearing on the annual schedule was July 13 2026, adoption not confirmed). NOT included: electrical ($75 plus openings), plumbing, mechanical ($60 minimum), gas and insulation trade permits, electrical availability fee $2,200 per lot (electric subdivisions) and developer electric fees, meter and vault cost plus 10%, Pasquotank County fees. Page never shows a total. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development fee, 3/4 inch meter water | $3,395 per connection by meter size (adopted June 11 2018) | $3,395 | Printed Effective n/a Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Water and Sewer System Development Fees fetched 2026-11-09, sha256 600634bfd744 |
| Wastewater system development fee, 3/4 inch meter sewer | $3,113 per connection by meter size (adopted June 11 2018) | $3,113 | Printed Effective n/a Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Water and Sewer System Development Fees fetched 2026-11-09, sha256 600634bfd744 |
| Water tap fee, 3/4 inch water | $1,150 per tap (revised February 10 2020) | $1,150 | Printed Effective n/a Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Tap Fee Schedule, Water Tap Fees fetched 2026-11-09, sha256 600634bfd744 |
| Sewer tap fee, 4 inch sewer | $1,150 per tap (4 inch is the first sewer tap size listed) | $1,150 | Printed Effective n/a Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Tap Fee Schedule, Sewer Tap Fees fetched 2026-11-09, sha256 600634bfd744 |
| Building permit permit · computed | $100.00 for the first $1,000 plus $10.00 per $1,000 after the first (round up to the next $1,000) valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400) | $3,900 | 100 + 10.00 x 380 = 3,900.00 Effective n/a Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Development Services, Building fetched 2026-11-09, sha256 600634bfd744 |
| Homeowners recovery fee permit | $10.00 per permit | $10 | Printed Effective n/a Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Development Services, Administrative and Negligence Fees fetched 2026-11-09, sha256 600634bfd744 |
| Total listed | $12,718 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.