Elizabeth City, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$12,718listed total
Nonerank by 2025 new single-family permits

Not included: Elizabeth City NC: water and wastewater system development fees (3/4 inch meter: 3,395 + 3,113), 3/4 inch water tap 1,150 and 4 inch sewer tap 1,150, building permit on computed valuation $380,268 ($100 first $1,000 + $10 per $1,000 rounded up = 3,900) and the $10 homeowners recovery fee, from the FY 2026-2027 Fee Schedule posted as Final (header date is a 00/00/00 placeholder; the council hearing on the annual schedule was July 13 2026, adoption not confirmed). NOT included: electrical ($75 plus openings), plumbing, mechanical ($60 minimum), gas and insulation trade permits, electrical availability fee $2,200 per lot (electric subdivisions) and developer electric fees, meter and vault cost plus 10%, Pasquotank County fees. Page never shows a total. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water system development fee, 3/4 inch meter
water
$3,395
per connection by meter size (adopted June 11 2018)
$3,395Printed
Effective n/a
Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Water and Sewer System Development Fees
fetched 2026-11-09, sha256 600634bfd744
Wastewater system development fee, 3/4 inch meter
sewer
$3,113
per connection by meter size (adopted June 11 2018)
$3,113Printed
Effective n/a
Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Water and Sewer System Development Fees
fetched 2026-11-09, sha256 600634bfd744
Water tap fee, 3/4 inch
water
$1,150
per tap (revised February 10 2020)
$1,150Printed
Effective n/a
Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Tap Fee Schedule, Water Tap Fees
fetched 2026-11-09, sha256 600634bfd744
Sewer tap fee, 4 inch
sewer
$1,150
per tap (4 inch is the first sewer tap size listed)
$1,150Printed
Effective n/a
Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Tap Fee Schedule, Sewer Tap Fees
fetched 2026-11-09, sha256 600634bfd744
Building permit
permit · computed
$100.00 for the first $1,000 plus $10.00 per $1,000 after the first (round up to the next $1,000)
valuation $380,268 (ICC 175.92 x 2,000 + 71.07 x 400)
$3,900100 + 10.00 x 380 = 3,900.00
Effective n/a
Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Development Services, Building
fetched 2026-11-09, sha256 600634bfd744
Homeowners recovery fee
permit
$10.00
per permit
$10Printed
Effective n/a
Source · City of Elizabeth City FY 2026-2027 Fee Schedule (posted as Final; header date placeholder 00/00/00; council hearing July 13 2026), Development Services, Administrative and Negligence Fees
fetched 2026-11-09, sha256 600634bfd744
Total listed$12,718

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.