Padstake
Menu

Burlington, NC

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$10,169listed total
Nonerank by 2025 new single-family permits

Not included: Burlington NC: water and sewer system development fees for 3/4 inch meter (684 + 1,406), water tap with meter and backflow 3,100, radio read 375, sewer tap 3,800 (inside-city rates; outside-city double, shown on each line), residential building permit 0.31/sq ft x 2,000, 200-amp electrical permit 100, plumbing permit 84, from the City of Burlington 2026 Fee Schedules (07/01/26). Burlington has no impact fees for roads/parks. NOT included: mechanical permit (per BTU of equipment), additional bath plumbing, underground electrical inspection $75, zoning/driveway permits ($250), Alamance County school or other county fees, stormwater. 2026-11-09 lane B.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water system development fee, 3/4 inch meter
water
$684
per connection, by meter size
$684Printed
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.20 System Development Fees
fetched 2026-11-09, sha256 ca633e6d5177
Sewer system development fee, 3/4 inch meter size
sewer
$1,406
per connection, by water meter size
$1,406Printed
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.21 System Development Fees
fetched 2026-11-09, sha256 ca633e6d5177
Water tap, 1 inch tap with 5/8 x 3/4 inch meter and backflow (inside city)
water
$3,100 inside | $6,200 outside
single-family, installed price
$3,100Printed (inside city)
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.20 Water Tap Fees
fetched 2026-11-09, sha256 ca633e6d5177
Radio read, 5/8 x 3/4 inch meter (inside city)
water
$375 inside | $750 outside
per meter
$375Printed (inside city)
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.20 Radio Read
fetched 2026-11-09, sha256 ca633e6d5177
Sewer tap, 4 inch single-family residential (inside city)
sewer
$3,800 inside | $7,600 outside
per tap
$3,800Printed (inside city)
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.21 Sewer Tap Fees
fetched 2026-11-09, sha256 ca633e6d5177
Residential building permit
permit · computed
$0.31 per sq ft up to 2,500 sq ft ($52 minimum per inspection)
per sq ft, 2,000 sq ft heated
$6200.31 x 2,000 = 620.00
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.7 Inspections Dept Residential and Modular building
fetched 2026-11-09, sha256 ca633e6d5177
New construction electrical permit, 200 amps or less
permit
$100
flat
$100Printed
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.7 New Construction - Electrical permits
fetched 2026-11-09, sha256 ca633e6d5177
Plumbing permit, single/two family dwelling, kitchen-laundry-bath
permit
$84
flat; each additional full bath $31, half bath $21
$84Printed
Effective 2026-07-01
Source · City of Burlington 2026 Fee Schedules, all departments (07/01/26), p.8 Plumbing permit fees
fetched 2026-11-09, sha256 ca633e6d5177
Total listed$10,169

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.