Brunswick County Unincorporated Area, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Water and sewer: Brunswick County Public Utilities FY26-27 fee schedules (effective July 1, 2026): capital recovery and transmission fees are per bedroom, 3 bedrooms assumed; 3/4-inch meter and tap $2,900; sewer 4-inch nearside gravity tap $3,000. Building permit: FY27 schedule, 0.0045 x computed valuation $380,268 (includes all trade permits). North Carolina counties have no development impact fee; none is listed. Not included: grinder-pump or vacuum sewer services ($7,000 grinder pump station), sewer tap with pavement repair (cost plus 10%), septic and well permits (health department), parcels not served by county utilities or inside a municipality (Leland, Southport etc.), plan review (none listed). Staged 2026-11-09.
Water/sewer provider: Brunswick County Public Utilities
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water capital recovery fee water · computed | $955.00 per bedroom, residential | $2,865 | $955.00 x 3 bedrooms (3 bedrooms assumed) Effective 2026-07-01 Source · Water Fee Schedule FY 26-27 (Brunswick County Public Utilities), effective July 1, 2026 fetched 2026-11-09, sha256 5097aae81f86 |
| Water transmission capital recovery fee water · computed | $119.00 per bedroom, residential | $357 | $119.00 x 3 bedrooms (3 bedrooms assumed) Effective 2026-07-01 Source · Water Fee Schedule FY 26-27 (Brunswick County Public Utilities), effective July 1, 2026 fetched 2026-11-09, sha256 5097aae81f86 |
| Sewer capital recovery fee sewer · computed | $1,956.00 per bedroom, residential | $5,868 | $1,956.00 x 3 bedrooms (3 bedrooms assumed) Effective 2026-07-01 Source · Wastewater Fee Schedule FY 26-27 (Brunswick County Public Utilities), effective July 1, 2026 fetched 2026-11-09, sha256 5ff8a9402114 |
| Sewer transmission capital recovery fee sewer · computed | $252.00 per bedroom, residential | $756 | $252.00 x 3 bedrooms (3 bedrooms assumed) Effective 2026-07-01 Source · Wastewater Fee Schedule FY 26-27 (Brunswick County Public Utilities), effective July 1, 2026 fetched 2026-11-09, sha256 5ff8a9402114 |
| 3/4-inch meter installation and tap water | $2,900.00 per 3/4 inch residential connection (includes up to 40 ft of piping) | $2,900 | Printed Effective 2026-07-01 Source · Water Fee Schedule FY 26-27 (Brunswick County Public Utilities), effective July 1, 2026, Tap and Meter Fees fetched 2026-11-09, sha256 5097aae81f86 |
| 4-inch nearside residential gravity service tap sewer | $3,000.00 per residential gravity sewer tap | $3,000 | Printed Effective 2026-07-01 Source · Wastewater Fee Schedule FY 26-27 (Brunswick County Public Utilities), effective July 1, 2026, Tap and Grinder Pump Station Fees fetched 2026-11-09, sha256 5ff8a9402114 |
| Residential new construction permit (includes all trade permits) permit · computed | Sq. Ft. x ICC Chart Value x .0045 (R-3, Type VB) percent of valuation | $1,711.21 | Valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 sq ft + U V-B 71.07 x 400 sq ft) x 0.0045 = 1,711.21 Effective 2026-07-01 Source · FY 27 Building Fee Schedule (effective July 1, 2026), Residential Permit Fee Calculations fetched 2026-11-09, sha256 190e9c95d2d3 |
| Total listed | $17,457.21 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.