Bald Head Island village, NC
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Bald Head Island NC (inside the Village): residential 3/4 inch water connection 14,020, residential sewer connection 7,000 (grinder pump required; 1,400 where no grinder pump is needed), from the FY 2026-27 Utilities Fund Fee Schedule effective July 1 2026, and the building permit on the village own valuation per sq ft (2,000 heated x 155 + 400 covered x 75 = 340,000; 7 per $1,000 = 2,380) from the FY 2026-27 Development Services Fee Schedule. NOT included: plumbing (50 basic + 6 per fixture unit), electrical living unit 150, heating/air 70, fire prevention items, account setup 21.52, debt/capital surcharge per REU per month, Brunswick County and school fees, ferry and barge costs. 2026-11-09 lane B.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water connection charge, residential 3/4 inch meter water | 14,020 residential 3/4 inch meter | $14,020 | Printed Effective 2026-07-01 Source · Bald Head Island FY 2026-2027 Utilities Fund Fee Schedule (effective July 1 2026), 1 Connection Charges, Water, Residential fetched 2026-11-09, sha256 696b45d09c65 |
| Sewer connection charge, residential sewer · computed | 7,000 grinder pump required | 1,400 no grinder pump required grinder pump configuration shown (the higher) | $7,000 | Printed (grinder pump required, the higher) Effective 2026-07-01 Source · Bald Head Island FY 2026-2027 Utilities Fund Fee Schedule (effective July 1 2026), 1 Connection Charges, Sewer, Residential fetched 2026-11-09, sha256 696b45d09c65 |
| Building permit, valuation-based permit · computed | > $30,000 = $7.00 per $1,000 or fraction thereof; valuation per sq ft: residential heated space 155, residential covered area 75 village valuation: 2,000 sq ft heated x 155 + 400 sq ft covered x 75 = 340,000; 340 thousands x 7 | $2,380 | 7 x 340 = 2380.00 Effective 2026-07-01 Source · Bald Head Island FY 2026-2027 Development Services Fee Schedule (effective July 1 2026), 1 Building Permit Fee, 2 Structure Valuation fetched 2026-11-09, sha256 c0258a0b5907 |
| Total listed | $23,400 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.