Moberly, MO
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: residential new construction building permit $5.00 per $1,000 of value on the computed ICC valuation $380,268 = $1,901.34 (the permit is applied pro rata; the schedule prints no new-house valuation rate and the city permit application mentions a different .002 multiplier, so this figure should be re-checked), first residential occupancy inspection $50, 5/8-inch water tap $300 and sewer tap $150 (City of Moberly fee schedule 2025, last revised Dec 19 2025). No impact fee is posted. Not included: water meter (not priced), residential deposit (no fee for owners), plan review, heating $30 per appliance and other trade permits, right-of-way openings. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Moberly
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Residential new construction building permit permit · computed | $5.00 per $1,000.00 of value valuation 380,268 (ICC convention) | $1,901.34 | 5.00 x 380.268 = 1,901.34; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400 Effective 2025-12-19 Source · City of Moberly City Ordinance Fee Schedule 2025 (last revised Dec 19 2025), Building and Construction, Building permit fetched 2026-11-09, sha256 afc57ed0a7c8 |
| Residential occupancy inspection, first inspection permit | $50.00 per dwelling | $50 | Printed Effective 2025-12-19 Source · City of Moberly City Ordinance Fee Schedule 2025 (last revised Dec 19 2025), Residential occupancy inspections fetched 2026-11-09, sha256 afc57ed0a7c8 |
| 5/8-inch water tap water | $300.00 per tap | $300 | Printed Effective 2025-12-19 Source · City of Moberly City Ordinance Fee Schedule 2025 (last revised Dec 19 2025), Tapping water or sewer mains fetched 2026-11-09, sha256 afc57ed0a7c8 |
| Sewer tap sewer | $150.00 per tap | $150 | Printed Effective 2025-12-19 Source · City of Moberly City Ordinance Fee Schedule 2025 (last revised Dec 19 2025), Tapping water or sewer mains fetched 2026-11-09, sha256 afc57ed0a7c8 |
| Total listed | $2,401.34 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.