Padstake
Menu

Lees Summit, MO

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Included: water tap and meter set-up and sewer tap for a 5/8 x 3/4-inch meter (July 1 2026 columns) and the new single-family permit at 0.4% of valuation using the project convention $380,268 (computed). Missing: road license/excise tax (an infrastructure impact fee; city page gives the method ITE trips x tax rate, but the rate is only in a fee estimation tool, not posted as text), so no total. Not included: plumbing/electrical/mechanical permits, plan review, utility deposits. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Lee's Summit

LinePrinted ratePrototypeReceipt
Water system development charge: tap charge, 5/8 x 3/4-inch displacement meter
water
$4,218.00
per tap, by meter size
$4,218Printed (July 1 2026 column; July 1 2025 column was $4,080.00)
Effective 2026-07-01
Source · Schedule of Fees, Water Utility Fees (effective July 1, 2026 column)
fetched 2026-11-09, sha256 5f7ca3a2927f
Water meter set-up, 5/8 x 3/4-inch displacement meter
water
$887.69
per meter
$887.69Printed (July 1 2026 column)
Effective 2026-07-01
Source · Schedule of Fees, Water Utility Fees (effective July 1, 2026 column)
fetched 2026-11-09, sha256 5f7ca3a2927f
Sewer system development charge: sewer tap, 5/8 x 3/4-inch displacement meter
sewer
$2,498.00
per tap, by meter size
$2,498Printed (July 1 2026 column; July 1 2025 column was $2,398.00)
Effective 2026-07-01
Source · Schedule of Fees, Sewer Tap Fees
fetched 2026-11-09, sha256 5f7ca3a2927f
New single-family building permit (0.4% of project construction valuation)
permit · computed
0.4% of project construction valuation
percent of valuation
$1,521.070.4% x 380,268 = 1,521.07; valuation 380,268 = ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 (page does not print the city valuation method)
Effective 2026-07-01
Source · Schedule of Fees, Development Services Fees
fetched 2026-11-09, sha256 c057b6099135

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.