Lees Summit, MO
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Included: water tap and meter set-up and sewer tap for a 5/8 x 3/4-inch meter (July 1 2026 columns) and the new single-family permit at 0.4% of valuation using the project convention $380,268 (computed). Missing: road license/excise tax (an infrastructure impact fee; city page gives the method ITE trips x tax rate, but the rate is only in a fee estimation tool, not posted as text), so no total. Not included: plumbing/electrical/mechanical permits, plan review, utility deposits. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Lee's Summit
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development charge: tap charge, 5/8 x 3/4-inch displacement meter water | $4,218.00 per tap, by meter size | $4,218 | Printed (July 1 2026 column; July 1 2025 column was $4,080.00) Effective 2026-07-01 Source · Schedule of Fees, Water Utility Fees (effective July 1, 2026 column) fetched 2026-11-09, sha256 5f7ca3a2927f |
| Water meter set-up, 5/8 x 3/4-inch displacement meter water | $887.69 per meter | $887.69 | Printed (July 1 2026 column) Effective 2026-07-01 Source · Schedule of Fees, Water Utility Fees (effective July 1, 2026 column) fetched 2026-11-09, sha256 5f7ca3a2927f |
| Sewer system development charge: sewer tap, 5/8 x 3/4-inch displacement meter sewer | $2,498.00 per tap, by meter size | $2,498 | Printed (July 1 2026 column; July 1 2025 column was $2,398.00) Effective 2026-07-01 Source · Schedule of Fees, Sewer Tap Fees fetched 2026-11-09, sha256 5f7ca3a2927f |
| New single-family building permit (0.4% of project construction valuation) permit · computed | 0.4% of project construction valuation percent of valuation | $1,521.07 | 0.4% x 380,268 = 1,521.07; valuation 380,268 = ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 (page does not print the city valuation method) Effective 2026-07-01 Source · Schedule of Fees, Development Services Fees fetched 2026-11-09, sha256 c057b6099135 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.