Padstake
Menu

Victoria, MN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$14,112.93listed total
Nonerank by 2025 new single-family permits

Not included: Included: water availability charge plus core charge $5,630 (highest by plat date; $3,940 for plats after 2017), sewer availability plus core charge $3,650, $50 water and $50 sewer municipal connection permits, building permit $2,868.44 and plan review 65% = $1,864.49 (fee table on the computed ICC valuation $380,268; the city says minimum valuation follows ICC) (City of Victoria 2026 Fee Schedule). Not included: Metropolitan Council SAC (determined by MCES, not posted), water and sewer main lateral benefit charges ($6,600 per unit each, only where a lateral benefit applies), park improvement fee $2,500 (plats before 5/23/16 only), warning siren fee $60 per lot (developer), state surcharge, trade permits, water meter. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Victoria

LinePrinted ratePrototypeReceipt
Water availability charge (developer portion) plus water core charge
water · computed
$3,380.00 availability (plats 2006-2016; $1,690.00 for plats after 2017) + $2,250.00 core (plats after 2006)
per REC unit or home
$5,6303,380 + 2,250 = 5,630; highest printed availability shown, range $3,940 to $5,630 by plat date
Effective 2026-01-01
Source · City of Victoria 2026 Fee Schedule, Water Connection Fees
fetched 2026-11-09, sha256 c1ca1158b075
Sewer availability charge (developer portion) plus sewer core charge
sewer · computed
$2,000.00 availability (plats after 2017) + $1,650.00 core (plats after 2006)
per REC unit or home
$3,6502,000 + 1,650 = 3,650
Effective 2026-01-01
Source · City of Victoria 2026 Fee Schedule, Sewer Connection Fees
fetched 2026-11-09, sha256 c1ca1158b075
Municipal connection permit, water
water
$50.00
per permit
$50Printed
Effective 2026-01-01
Source · City of Victoria 2026 Fee Schedule, Other permits, Water Permit
fetched 2026-11-09, sha256 c1ca1158b075
Municipal connection permit, sewer
sewer
$50.00
per permit
$50Printed
Effective 2026-01-01
Source · City of Victoria 2026 Fee Schedule, Other permits, Sewer Permit
fetched 2026-11-09, sha256 c1ca1158b075
Building permit, new house (valuation based)
permit · computed
$1,109.38 for the first $100,000 + $6.26 per additional $1,000 or fraction, to $500,000
valuation 380,268 (ICC minimum valuation)
$2,868.441,109.38 + 281 x 6.26 = 2,868.44; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400
Effective 2026-01-01
Source · City of Victoria 2026 Fee Schedule, Base Building Permit Fee Schedule
fetched 2026-11-09, sha256 c1ca1158b075
Plan review fee
permit · computed
65% of the building permit fee
65% of 2,868.44
$1,864.490.65 x 2,868.44 = 1,864.49
Effective 2026-01-01
Source · City of Victoria 2026 Fee Schedule, Plan Review Fees
fetched 2026-11-09, sha256 c1ca1158b075
Total listed$14,112.93

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.