Rosemount, MN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$11,472.61listed total
Nonerank by 2025 new single-family permits

Not included: City of Rosemount 2026 Fee Schedule (rosemountmn.gov DocumentCenter 8122, src 710). Valuation $380,268 by the decided rule (the city uses the Minnesota Department of Labor and Industry valuation table). One SAC unit assumed for a single-family house. Not included: trunk area assessments ($1,075 per acre sanitary sewer and $6,500 per acre water, collected at final plat), plumbing/HVAC permits (fees per item), state surcharge, water meter (actual cost), GIS $60 per lot, park dedication (1/25 acre per dwelling times a land value per acre, Exhibit F, not applied), street assessments. Lane A 2026-11-09.

Water/sewer provider: City of Rosemount

LinePrinted ratePrototypeReceipt
Building permit, valuation $100,000.01 - $500,000.00 (valuation $380,268 computed)
permit · computed
$1,186.65 for the first $100,000 plus $6.75 per additional $1,000
valuation tier (MN 326B.153 Exhibit A)
$3,083.401,186.65 + 6.75 x 281 = 3083.40
Effective 2026-01-01
Source · 2026 Fee Schedule, Exhibit A
fetched 2026-11-09, sha256 e0d510cfb498
Plan check, new single-family dwelling, 65% of building permit fee
permit · computed
65% of building permit fee
percent of permit fee
$2,004.210.65 x 3083.40 = 2004.21
Effective 2026-01-01
Source · Plan Check Fees
fetched 2026-11-09, sha256 e0d510cfb498
Electrical permit, new single-family dwelling (0-25 circuits/feeders)
permit
$225.00
flat
$225Printed
Effective 2026-01-01
Source · Electrical permits
fetched 2026-11-09, sha256 e0d510cfb498
Water Access Charge (WAC), single family (collected with building permit)
water
2,475.00
per single-family connection
$2,475Printed
Effective 2026-01-01
Source · Water, Sanitary Sewer & Storm Water Capital Charges, p. 20
fetched 2026-11-09, sha256 e0d510cfb498
City sanitary sewer availability charge, per SAC unit (collected with building permit)
sewer
$1,200.00
per SAC unit (single-family = 1)
$1,200Printed
Effective 2026-01-01
Source · same
fetched 2026-11-09, sha256 e0d510cfb498
Metropolitan Council Environmental Services availability charge (Metro SAC)
sewer
$2,485.00
per SAC unit
$2,485Printed
Effective 2026-01-01
Source · same
fetched 2026-11-09, sha256 e0d510cfb498
Total listed$11,472.61

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.