Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$14,208.03listed total
Nonerank by 2025 new single-family permits

Not included: Included: WAC, city SAC, Metropolitan Council SAC, exterior sewer/water permit, park dedication cash (single family), valuation building permit with 65% plan review and 15% fire inspection surcharge, residential mechanical permit and certificate of occupancy inspection (2026 Fee Schedule). Valuation uses the project convention $380,268. The exterior sewer/water permit is printed "$57.00 and $57.00 ($121.00)"; the parenthetical $121.00 is used as the combined amount (computed). Not included: plumbing ($89 minimum with 1.25% of project value, value not known), electrical (max $200 for up to 200 amps, depends on circuits), water meter, street fees. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Oakdale

LinePrinted ratePrototypeReceipt
WAC (water availability)
water
$800.00
per unit
$800Printed
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Utilities, Public Utilities Connection
fetched 2026-11-09, sha256 5bf7a63c4538
SAC (sewer availability), city
sewer
$550.00
per unit
$550Printed
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Utilities, Public Utilities Connection
fetched 2026-11-09, sha256 5bf7a63c4538
Metropolitan Council SAC charge
sewer
$2,485.00
per SAC unit
$2,485Printed, 1 unit single-family
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Utilities, Public Utilities Connection
fetched 2026-11-09, sha256 5bf7a63c4538
Exterior sewer/water permit, residential
permit · computed
$57.00 and $57.00 ($121.00)
sewer and water permits
$121Printed combined amount in parentheses: 121.00 (two permits at 57.00 each plus the printed difference)
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Building Inspections
fetched 2026-11-09, sha256 5bf7a63c4538
Park dedication, residential single family (cash)
parks · computed
0.052 acres/unit x $90,371.60/acre = $4,699.32/unit
per unit
$4,699.32Printed cash amount per unit (first printed number is acres)
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Community Development, Park Dedication
fetched 2026-11-09, sha256 5bf7a63c4538
Building permit, value based, tier $100,001 to $500,000 (valuation $380,268 computed)
permit · computed
$1,195.00 for first $100,000, plus $6.50 for each additional $1,000 or fraction thereof
valuation tier
$3,021.501,195.00 + 6.50 x 281 (each $1,000 or fraction of 280,268) = 3,021.50; valuation 380,268 = ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Building Permits
fetched 2026-11-09, sha256 5bf7a63c4538
Plan review (percent of permit fee)
permit · computed
65% of permit fee
percent of permit fee
$1,963.9865% x 3,021.50 = 1,963.98
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Building Permits
fetched 2026-11-09, sha256 5bf7a63c4538
Fire inspection surcharge, value based building permits
permit · computed
15% of the permit fee
percent of permit fee
$453.2315% x 3,021.50 = 453.23
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Building Permits
fetched 2026-11-09, sha256 5bf7a63c4538
Mechanical permit, warm air residential
permit
$57.00
flat
$57Printed
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Building Inspections
fetched 2026-11-09, sha256 5bf7a63c4538
Certificate of occupancy inspection
permit
$57.00
flat
$57Printed
Effective 2026-01-01
Source · Oakdale 2026 Fee Schedule (adopted 12/9/2025), Building Permits
fetched 2026-11-09, sha256 5bf7a63c4538
Total listed$14,208.03

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.