Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: water access fee (WAC) $1,700, residential trunk water fee $3,500, sewer access fee (SAC) $2,471, residential trunk sewer fee $1,656, water and sewer connection inspections $70 each, residential park dedication $1,800, building permit $2,567.35 and plan review 65% = $1,668.78 (valuation table on the computed ICC valuation $380,268; the city prints no new-house rate) (City of North Branch 2026 Fee Schedule). Not included: water meter (cost plus 10%, no price posted), state surcharge (rate not printed), new residential plumbing permit $89 and mechanical permit $89 (trades), stormwater connection. Searched 2026-11-09 (lane A).
Water/sewer provider: City of North Branch
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water access fee (WAC) water | $1,700.00 per unit per unit | $1,700 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Building Department Fees fetched 2026-11-09, sha256 a8095a4e5521 |
| Trunk water fee, residential water | $3,500/Unit per unit | $3,500 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Water fees fetched 2026-11-09, sha256 a8095a4e5521 |
| Water connection inspection fee water | $70.00 per connection | $70 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Building Department Fees fetched 2026-11-09, sha256 a8095a4e5521 |
| Sewer access fee (SAC) sewer | $2,471.00 per unit per unit | $2,471 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Building Department Fees fetched 2026-11-09, sha256 a8095a4e5521 |
| Trunk sewer fee, residential sewer | $1,656/Unit per unit | $1,656 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Sewer fees fetched 2026-11-09, sha256 a8095a4e5521 |
| Sewer connection inspection fee sewer | $70.00 per connection | $70 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Building Department Fees fetched 2026-11-09, sha256 a8095a4e5521 |
| Park dedication, residential impact | $1,800.00 per unit per unit | $1,800 | Printed Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Park Dedication fetched 2026-11-09, sha256 a8095a4e5521 |
| Building permit, new house (valuation based) permit · computed | $993.75 for the first $100,000 + $5.60 per additional $1,000 or fraction, to $500,000 valuation 380,268 (ICC convention) | $2,567.35 | 993.75 + 281 x 5.60 = 2,567.35; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400 Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, North Branch Building Fee Schedule fetched 2026-11-09, sha256 a8095a4e5521 |
| Plan review fee permit · computed | 65% of permit fee 65% of 2,567.35 | $1,668.78 | 0.65 x 2,567.35 = 1,668.78 Effective 2026-01-01 Source · City of North Branch 2026 Fee Schedule, Plan Review Fee fetched 2026-11-09, sha256 a8095a4e5521 |
| Total listed | $15,503.13 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199