Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$15,503.13listed total
Nonerank by 2025 new single-family permits

Not included: Included: water access fee (WAC) $1,700, residential trunk water fee $3,500, sewer access fee (SAC) $2,471, residential trunk sewer fee $1,656, water and sewer connection inspections $70 each, residential park dedication $1,800, building permit $2,567.35 and plan review 65% = $1,668.78 (valuation table on the computed ICC valuation $380,268; the city prints no new-house rate) (City of North Branch 2026 Fee Schedule). Not included: water meter (cost plus 10%, no price posted), state surcharge (rate not printed), new residential plumbing permit $89 and mechanical permit $89 (trades), stormwater connection. Searched 2026-11-09 (lane A).

Water/sewer provider: City of North Branch

LinePrinted ratePrototypeReceipt
Water access fee (WAC)
water
$1,700.00 per unit
per unit
$1,700Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Building Department Fees
fetched 2026-11-09, sha256 a8095a4e5521
Trunk water fee, residential
water
$3,500/Unit
per unit
$3,500Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Water fees
fetched 2026-11-09, sha256 a8095a4e5521
Water connection inspection fee
water
$70.00
per connection
$70Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Building Department Fees
fetched 2026-11-09, sha256 a8095a4e5521
Sewer access fee (SAC)
sewer
$2,471.00 per unit
per unit
$2,471Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Building Department Fees
fetched 2026-11-09, sha256 a8095a4e5521
Trunk sewer fee, residential
sewer
$1,656/Unit
per unit
$1,656Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Sewer fees
fetched 2026-11-09, sha256 a8095a4e5521
Sewer connection inspection fee
sewer
$70.00
per connection
$70Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Building Department Fees
fetched 2026-11-09, sha256 a8095a4e5521
Park dedication, residential
impact
$1,800.00 per unit
per unit
$1,800Printed
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Park Dedication
fetched 2026-11-09, sha256 a8095a4e5521
Building permit, new house (valuation based)
permit · computed
$993.75 for the first $100,000 + $5.60 per additional $1,000 or fraction, to $500,000
valuation 380,268 (ICC convention)
$2,567.35993.75 + 281 x 5.60 = 2,567.35; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, North Branch Building Fee Schedule
fetched 2026-11-09, sha256 a8095a4e5521
Plan review fee
permit · computed
65% of permit fee
65% of 2,567.35
$1,668.780.65 x 2,567.35 = 1,668.78
Effective 2026-01-01
Source · City of North Branch 2026 Fee Schedule, Plan Review Fee
fetched 2026-11-09, sha256 a8095a4e5521
Total listed$15,503.13

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.