Farmington, MN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$11,977.17listed total
Nonerank by 2025 new single-family permits

Not included: Included: sewer and water connection permits, lateral charges, city sewer availability charge, MCES SAC, water reserve capacity (WAC) fee for 1 REU, valuation-based building permit and plan review, erosion control permit (2026 City Fee Schedule). Building permit valuation uses the city own Residential Building Valuations table (single-family first floor $103.77/sq ft, wood-frame garage $48.75/sq ft; 2,000 sq ft house plus 400 sq ft garage) rather than the ICC convention. Not included: per-acre sanitary sewer and water trunk area charges, surface water fees, parkland dedication (ordinance calculation), $3,000 builder escrow (refundable), electrical/plumbing/mechanical permits, MCES SAC REU determination could exceed 1 REU. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Farmington

LinePrinted ratePrototypeReceipt
Sewer connection permit
sewer
$75/each
per permit
$75Printed
Effective 2023-01-01
Source · 2026 City Fee Schedule, Utility Service Connection Permits
fetched 2026-11-09, sha256 814119d9dc68
Sewer lateral connection charge
sewer
$2,160
per connection
$2,160Printed
Effective 2023-01-01
Source · 2026 City Fee Schedule, Utility Service Connection Permits
fetched 2026-11-09, sha256 814119d9dc68
City sewer availability charge (CSAC)
sewer
$590/REU; REU determination by Metropolitan Council
per REU
$590Printed, single-family 1 REU
Effective 2025-01-01
Source · 2026 City Fee Schedule, Utility Service Connection Permits
fetched 2026-11-09, sha256 814119d9dc68
MCES sewer availability charge (SAC)
sewer
$2,485/REU); REU determination by Metropolitan Council
per REU
$2,485Printed, single-family 1 REU
Effective 2022-01-01
Source · 2026 City Fee Schedule, Utility Service Connection Permits
fetched 2026-11-09, sha256 814119d9dc68
Water connection permit
water
$75/each
per permit
$75Printed
Effective 2023-01-01
Source · 2026 City Fee Schedule, Water
fetched 2026-11-09, sha256 814119d9dc68
Water lateral connection charge
water
$1,515/each
per connection
$1,515Printed
Effective 2023-01-01
Source · 2026 City Fee Schedule, Water
fetched 2026-11-09, sha256 814119d9dc68
Reserve capacity connection (WAC) fee
water
$2,610/REU; REU determination by Metropolitan Council
per REU
$2,610Printed, single-family 1 REU
Effective 2025-01-01
Source · 2026 City Fee Schedule, Water
fetched 2026-11-09, sha256 814119d9dc68
Building permit, Schedule I tier $100,001 - $500,000 (city valuation $227,040 computed)
permit · computed
$1,257.85 for the first $100,000; $7.16 per additional $1,000
valuation tier
$2,167.171,257.85 + 7.16 x 127 (each $1,000 or fraction of 127,040) = 2,167.17; city Residential Building Valuations: 2,000 sq ft x $103.77 first floor + 400 sq ft garage x $48.75 = 227,040
Effective 2026-01-01
Source · 2026 City Fee Schedule, Schedule I and Residential Building Valuations
fetched 2026-11-09, sha256 814119d9dc68
Plan review, new single-family development
permit
$100
per development
$100Printed
Effective 2022-01-01
Source · 2026 City Fee Schedule, Permits - Building
fetched 2026-11-09, sha256 814119d9dc68
Erosion control/grading initial permit fee
permit
$200
per permit
$200Printed
Effective 2026-01-01
Source · 2026 City Fee Schedule, Utility Service Connection Permits
fetched 2026-11-09, sha256 814119d9dc68
Total listed$11,977.17

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.