Elk River, MN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: SAC $6,426, water access charge $3,990 ($3,600 builder connection + $390 developer availability), sewer and water hookup permit $100, residential park dedication fee (highest density tier $5,945.38 shown as headline; low density $3,065.73, medium $4,207.25), building permit $2,781.50 on the computed ICC valuation $380,268, plan review 65% = $1,807.98 and state surcharge $190.13 (City of Elk River 2026 Master Fee Schedule; the city prints no new-house valuation rate). Not included: water meter fee (handled by Elk River Municipal Utilities, no price posted in this schedule), plumbing/mechanical permits, stormwater utility fee, trunk or area charges (not printed in this schedule). Searched 2026-11-09 (lane A).
Water/sewer provider: City of Elk River
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer Availability Charge (SAC) sewer | $6,426 per unit 1 unit | $6,426 | Printed Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A) fetched 2026-11-09, sha256 cf81ede930c8 |
| Water Access Charge = water connection charge (builder) $3,600 + water availability charge (developer) $390 water · computed | $3,990.00 per plumbing unit | $3,990 | 3,600 + 390 = 3,990 Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A) fetched 2026-11-09, sha256 cf81ede930c8 |
| Sewer and water hookup permit, residential sewer | $100 residential per permit | $100 | Printed Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A), Sewer & Water Hookup/Repair Permit fetched 2026-11-09, sha256 cf81ede930c8 |
| Park dedication fee, residential impact · computed | $5,945.38/dwelling unit high density (low density $3,065.73; medium density $4,207.25) per dwelling unit | $5,945.38 | Highest printed density shown as headline; low density $3,065.73 Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A), Park Dedication Fee fetched 2026-11-09, sha256 cf81ede930c8 |
| Building permit, new house (valuation based) permit · computed | $1,095.50 for the first $100,000 + $6 per additional $1,000 or fraction, to $500,000 valuation 380,268 (ICC convention) | $2,781.50 | 1,095.50 + 281 x 6 = 2,781.50; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400 Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A), Building Permit fetched 2026-11-09, sha256 cf81ede930c8 |
| Plan review fee permit · computed | 65% of the permit fee 65% of 2,781.50 | $1,807.98 | 0.65 x 2,781.50 = 1,807.98 Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A), Plan Review Fee fetched 2026-11-09, sha256 cf81ede930c8 |
| State of Minnesota surcharge permit · computed | 0.0005 times the valuation valuation 380,268 | $190.13 | 0.0005 x 380,268 = 190.13 Effective 2026-01-01 Source · City of Elk River 2026 Master Fee Schedule (Exhibit A), State of Minnesota Surcharge fetched 2026-11-09, sha256 cf81ede930c8 |
| Total listed | $21,240.99 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.