Dayton, MN

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$32,495.26listed total
Nonerank by 2025 new single-family permits

Not included: Included: per-unit residential trunk charges (sewer, water, storm water, park, trail; based on an average of 3 units per acre), SAC, Met Council SAC, WAC, sewer and water connection charges, valuation building permit with 65% plan check and state surcharge, residential mechanical and plumbing permits (2026 Fee Schedule; Sections 3 and 4 read visually because the extracted text order is scrambled). Valuation uses the project convention $380,268. Not included: water meter (actual cost incurred by the city), Maple Grove WAC $3,472/unit (South Dayton only), additional plumbing/mechanical fixtures at $5 each, electrical, escrows. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Dayton

LinePrinted ratePrototypeReceipt
Sanitary sewer trunk area charge, residential (per unit)
sewer
$2,754/unit
per unit
$2,754Printed (based on average 3 units per acre)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Water trunk area charge, residential (per unit)
water
$4,464/unit
per unit
$4,464Printed (based on average 3 units per acre)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Storm water trunk area charge, residential (per unit)
stormwater
$3,963/unit
per unit
$3,963Printed (based on average 3 units per acre)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Park dedication trunk charge, residential (per unit)
parks
$4,542/unit
per unit
$4,542Printed (based on average 3 units per acre)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Trail dedication trunk charge, residential (per unit)
parks
$2,824/unit
per unit
$2,824Printed (based on average 3 units per acre)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Sewer access charge (SAC), residential
sewer
$977/unit
per unit
$977Printed (paid with building permit)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Met Council sewer access charge (SAC), residential
sewer
$2,485/unit
per unit
$2,485Printed
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Water access charge (WAC), residential
water
$5,686/unit
per unit
$5,686Printed (paid with building permit)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees
fetched 2026-11-09, sha256 845c97b23a25
Sewer connection charge
sewer · computed
$100 + $1 State Surcharge
per connection
$101100 + 1 = 101.00
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 4 Over the Counter, Connection Charges
fetched 2026-11-09, sha256 845c97b23a25
Water connection charge (water meter at actual cost, not posted)
water · computed
$100 + $1 State Surcharge + Water Meter Fee in Section 3
per connection
$101100 + 1 = 101.00; meter actual cost not included
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 4 Over the Counter, Connection Charges
fetched 2026-11-09, sha256 845c97b23a25
Building permit, new construction home, valuation tier $100,001 to $500,000 (valuation $380,268 computed)
permit · computed
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof
valuation tier
$2,567.35993.75 + 5.60 x 281 (each $1,000 or fraction of 280,268) = 2,567.35; valuation 380,268 = ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 10 Valuation Building Permit Fees
fetched 2026-11-09, sha256 845c97b23a25
Plan check, new construction homes
permit · computed
65% of Permit Fee
percent of permit fee
$1,668.7865% x 2,567.35 = 1,668.78
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 10 Plan Check Types
fetched 2026-11-09, sha256 845c97b23a25
State surcharge on valuation (one-half mill)
permit · computed
One-half mill (.0005) of the valuation
percent of valuation
$190.130.0005 x 380,268 = 190.13
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 10 State Surcharge
fetched 2026-11-09, sha256 845c97b23a25
Mechanical permit, residential
permit · computed
$85 + $5 Per Additional Fixture + $1 State Surcharge
flat plus per fixture
$8685 + 1 = 86.00 (additional fixtures not added)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 3 Building
fetched 2026-11-09, sha256 845c97b23a25
Plumbing permit, residential
permit · computed
$85 + $5 Per Additional Fixture + $1 State Surcharge
flat plus per fixture
$8685 + 1 = 86.00 (additional fixtures not added)
Effective 2026-01-01
Source · Dayton MN 2026 Fee Schedule, Section 3 Building
fetched 2026-11-09, sha256 845c97b23a25
Total listed$32,495.26

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.