Dayton, MN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Included: per-unit residential trunk charges (sewer, water, storm water, park, trail; based on an average of 3 units per acre), SAC, Met Council SAC, WAC, sewer and water connection charges, valuation building permit with 65% plan check and state surcharge, residential mechanical and plumbing permits (2026 Fee Schedule; Sections 3 and 4 read visually because the extracted text order is scrambled). Valuation uses the project convention $380,268. Not included: water meter (actual cost incurred by the city), Maple Grove WAC $3,472/unit (South Dayton only), additional plumbing/mechanical fixtures at $5 each, electrical, escrows. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Dayton
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sanitary sewer trunk area charge, residential (per unit) sewer | $2,754/unit per unit | $2,754 | Printed (based on average 3 units per acre) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Water trunk area charge, residential (per unit) water | $4,464/unit per unit | $4,464 | Printed (based on average 3 units per acre) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Storm water trunk area charge, residential (per unit) stormwater | $3,963/unit per unit | $3,963 | Printed (based on average 3 units per acre) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Park dedication trunk charge, residential (per unit) parks | $4,542/unit per unit | $4,542 | Printed (based on average 3 units per acre) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Trail dedication trunk charge, residential (per unit) parks | $2,824/unit per unit | $2,824 | Printed (based on average 3 units per acre) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Sewer access charge (SAC), residential sewer | $977/unit per unit | $977 | Printed (paid with building permit) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Met Council sewer access charge (SAC), residential sewer | $2,485/unit per unit | $2,485 | Printed Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Water access charge (WAC), residential water | $5,686/unit per unit | $5,686 | Printed (paid with building permit) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 9 Development Trunk & Connection Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Sewer connection charge sewer · computed | $100 + $1 State Surcharge per connection | $101 | 100 + 1 = 101.00 Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 4 Over the Counter, Connection Charges fetched 2026-11-09, sha256 845c97b23a25 |
| Water connection charge (water meter at actual cost, not posted) water · computed | $100 + $1 State Surcharge + Water Meter Fee in Section 3 per connection | $101 | 100 + 1 = 101.00; meter actual cost not included Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 4 Over the Counter, Connection Charges fetched 2026-11-09, sha256 845c97b23a25 |
| Building permit, new construction home, valuation tier $100,001 to $500,000 (valuation $380,268 computed) permit · computed | $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof valuation tier | $2,567.35 | 993.75 + 5.60 x 281 (each $1,000 or fraction of 280,268) = 2,567.35; valuation 380,268 = ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400 Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 10 Valuation Building Permit Fees fetched 2026-11-09, sha256 845c97b23a25 |
| Plan check, new construction homes permit · computed | 65% of Permit Fee percent of permit fee | $1,668.78 | 65% x 2,567.35 = 1,668.78 Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 10 Plan Check Types fetched 2026-11-09, sha256 845c97b23a25 |
| State surcharge on valuation (one-half mill) permit · computed | One-half mill (.0005) of the valuation percent of valuation | $190.13 | 0.0005 x 380,268 = 190.13 Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 10 State Surcharge fetched 2026-11-09, sha256 845c97b23a25 |
| Mechanical permit, residential permit · computed | $85 + $5 Per Additional Fixture + $1 State Surcharge flat plus per fixture | $86 | 85 + 1 = 86.00 (additional fixtures not added) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 3 Building fetched 2026-11-09, sha256 845c97b23a25 |
| Plumbing permit, residential permit · computed | $85 + $5 Per Additional Fixture + $1 State Surcharge flat plus per fixture | $86 | 85 + 1 = 86.00 (additional fixtures not added) Effective 2026-01-01 Source · Dayton MN 2026 Fee Schedule, Section 3 Building fetched 2026-11-09, sha256 845c97b23a25 |
| Total listed | $32,495.26 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.