Corcoran, MN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: City of Corcoran 2026 Fee Schedule (updated 6/25/2026, src 747) and 2026 Building Permit Fee Schedule (src 748). Valuation $380,268 by the decided rule; City of Corcoran-served connection fees shown (Maple Grove-served lots pay Maple Grove rates, water $3,472, listed on the same schedule). Not included: trunk line availability charges (per acre), Minnesota state surcharge, plumbing/mechanical/electrical permits, meter at market price plus 10%, $5,000 to $10,000 new construction escrow. Lane A 2026-11-09.
Water/sewer provider: City of Corcoran
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit, valuation $100,001.00 to $500,000.00 (valuation $380,268 computed) permit · computed | $887.25 for the first $100,000.00 plus $5.00 for each additional $1,000.00 valuation tier | $2,292.25 | 887.25 + 5.00 x 281 = 2292.25 Effective 2026-06-25 Source · Fee Schedule Building Permits 2026 fetched 2026-11-09, sha256 e56727fd3014 |
| Plan review fee, 65% of the building permit fee permit · computed | 65% of the Building Permit Fee percent | $1,489.96 | 0.65 x 2292.25 = 1489.96 Effective 2026-06-25 Source · same fetched 2026-11-09, sha256 e56727fd3014 |
| Sediment and erosion control (SEC) fee, new home (.0005 x permit valuation, minimum $150.00) permit · computed | .0005 x permit valuation, minimum $150.00 per valuation | $190.13 | 0.0005 x 380,268 = 190.13 Effective 2026-06-25 Source · same fetched 2026-11-09, sha256 e56727fd3014 |
| Zoning and set back review, new construction permit | $75.00 flat | $75 | Printed (plus any city planner review costs) Effective 2026-06-25 Source · same fetched 2026-11-09, sha256 e56727fd3014 |
| Emergency communications systems fee, new single family home permit | $100.00 flat | $100 | Printed Effective 2026-06-25 Source · same fetched 2026-11-09, sha256 e56727fd3014 |
| Water connection fee (per unit), single family, City of Corcoran water | $1,441.44 per unit | $1,441.44 | Printed Effective 2026-06-25 Source · Exhibit A Utility, Connection Fees fetched 2026-11-09, sha256 a86b8a3e1db1 |
| Sewer connection fee (per unit), single family, City of Corcoran sewer | $1,425.85 per unit | $1,425.85 | Printed Effective 2026-06-25 Source · same fetched 2026-11-09, sha256 a86b8a3e1db1 |
| Metropolitan Council Sewer Access Charge (SAC) sewer | $2,485.00 per SAC unit | $2,485 | Printed Effective 2026-06-25 Source · same fetched 2026-11-09, sha256 a86b8a3e1db1 |
| Residential park dedication fee, single family per unit (subdivision ordinance) parks | $5,954.00 per unit | $5,954 | Printed Effective 2026-06-25 Source · Planning fees, Section 955 fetched 2026-11-09, sha256 a86b8a3e1db1 |
| Total listed | $15,453.63 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.