Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$8,630listed total
Nonerank by 2025 new single-family permits

Not included: Included: sewer connection charge single family 5/8-inch meter $2,650, water connection charge 5/8-inch meter $1,850, water lateral tap 1-inch in curb lawn $2,000 (roadway $5,000), meter installation $75, building permit $2,005 on the computed ICC valuation $380,268 ($150 + $5 per $1,000 above $10,000, reading of the tiers), plan review $50 (City of Hudsonville Fee Schedule FY 2025-2026, approved 6/10/25; image-heavy tables read visually and transcribed; a FY 2026-2027 fee schedule was not found). No impact fee is posted. Not included: water meter itself (actual cost plus 15%, no price posted), sewer lateral tap (customer provides), main charges per foot where not assessed, electrical/plumbing/mechanical permits, ready-to-serve quarterly charges. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Hudsonville

LinePrinted ratePrototypeReceipt
Sewer connection charge, single family, 5/8-inch meter
sewer
$2,650
per connection (1 REU)
$2,650Printed
Effective 2025-06-10
Source · City of Hudsonville Fee Schedule, Fiscal Year 2025-2026 (approved 6/10/25), Sewer Connection Charge table (last revised 3/11/25)
fetched 2026-11-09, sha256 78d4b7c671e3
Water connection charge, 5/8-inch meter
water
$1,850
per connection
$1,850Printed
Effective 2025-06-10
Source · City of Hudsonville Fee Schedule, Fiscal Year 2025-2026 (approved 6/10/25), Public Utilities - Water
fetched 2026-11-09, sha256 78d4b7c671e3
Water lateral tap 1-inch (if not present), in curb lawn
water · computed
$2,000 (in roadway $5,000)
per tap
$2,000Printed; roadway $5,000
Effective 2025-06-10
Source · City of Hudsonville Fee Schedule, Fiscal Year 2025-2026 (approved 6/10/25), Public Utilities - Water
fetched 2026-11-09, sha256 78d4b7c671e3
Water meter installation
water
$75
per meter
$75Printed
Effective 2025-06-10
Source · City of Hudsonville Fee Schedule, Fiscal Year 2025-2026 (approved 6/10/25), Public Utilities - Water
fetched 2026-11-09, sha256 78d4b7c671e3
Building permit, one and two family (valuation based)
permit · computed
$150 + $5 per $1,000 above $10,000
valuation 380,268 (ICC convention)
$2,005150 + 371 x 5 = 2,005.00; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400; the $150 equals the fee at $10,000 on the lower tier, so the $5 per $1,000 applies above $10,000
Effective 2025-06-10
Source · City of Hudsonville Fee Schedule, Fiscal Year 2025-2026 (approved 6/10/25), PCI (Building Permits) Building Valuation Schedule
fetched 2026-11-09, sha256 78d4b7c671e3
Plan review, residential 1 and 2 family
permit
$50
per plan
$50Printed
Effective 2025-06-10
Source · City of Hudsonville Fee Schedule, Fiscal Year 2025-2026 (approved 6/10/25), PCI Plan Reviews
fetched 2026-11-09, sha256 78d4b7c671e3
Total listed$8,630

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.