Rockville, MD

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$14,525.31listed total
Nonerank by 2025 new single-family permits

Not included: Included: water capital contribution $4,100 and sewer capital contribution $8,050 (1-inch meter, the minimum for new residential), residential 1-inch meter setting with transceiver $970.81, water and sewer tap inspections $112 each, new residential construction permit $0.28 per sq ft x 2,400 sq ft (basement, floors, garage and roof) = $672, filing fee $278.75 per dwelling, occupancy permit $120 and the 10.25% automation fee on those = $109.75 (City of Rockville Fee Schedule effective July 1 2025; a July 2026 edition of the Inspection Services schedule was not found, only a July 2026 Public Works Development Fees sheet that exempts single-family development from water and sewer authorization fees). Not included: plumbing ($65.25 first fixture + $17.75 each) and mechanical permits, plan review, county fees. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Rockville

LinePrinted ratePrototypeReceipt
Water capital contribution, 1-inch meter (minimum for new residential)
impact
$4,100.00
per meter
$4,100Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Water and Sewer Capital Contribution Fees
fetched 2026-11-09, sha256 c953a5fd5c9b
Sewer capital contribution, 1-inch meter (minimum for new residential)
impact
$8,050.00
per meter
$8,050Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Water and Sewer Capital Contribution Fees
fetched 2026-11-09, sha256 c953a5fd5c9b
Residential water meter with transceiver and crock, 1-inch meter setting
water
$970.81
per meter
$970.81Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Water Meter Fees
fetched 2026-11-09, sha256 c953a5fd5c9b
Water tap inspection
water
$112.00 for water, sewer or fire tap
per tap
$112Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Water and Sewer Line Inspections
fetched 2026-11-09, sha256 c953a5fd5c9b
Sewer tap inspection
sewer
$112.00 for water, sewer or fire tap
per tap
$112Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Water and Sewer Line Inspections
fetched 2026-11-09, sha256 c953a5fd5c9b
Residential new construction permit (one- and two-family)
permit · computed
$0.28 per square foot including basement, each floor, garage and roof
2,400 sq ft (2,000 heated + 400 garage)
$6720.28 x 2,400 = 672.00 (assumed 2,400 sq ft)
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Building Permits, Residential
fetched 2026-11-09, sha256 c953a5fd5c9b
Filing fee, residential new construction
permit
$278.75 per dwelling
per dwelling
$278.75Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Building Permits, General
fetched 2026-11-09, sha256 c953a5fd5c9b
Occupancy permit
permit
$120.00 per dwelling unit
per dwelling unit
$120Printed
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Building Permits, Residential
fetched 2026-11-09, sha256 c953a5fd5c9b
Automation fee
permit · computed
10.25% of all permit and application fees
10.25% of (672.00 + 278.75 + 120.00)
$109.750.1025 x 1,070.75 = 109.75
Effective 2025-07-01
Source · City of Rockville Fee Schedule effective July 1, 2025 (Inspection Services Division), Automation Fee
fetched 2026-11-09, sha256 c953a5fd5c9b
Total listed$14,525.31

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.