Anne Arundel County Unincorporated Area, MD

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$46,259.68listed total
Nonerank by 2025 new single-family permits

Not included: Anne Arundel County Permit Fees (effective Oct 1 2024, src 774) and Utility & Impact Fees (effective July 1, 2026 to June 30, 2027, src 772), aacounty.org. 2,000 sq ft house (impact fee band 2,000-2,499), valuation $380,268 by the decided rule, 1 EDU, 200 amp service assumed; permit lines include the $43 application fee for each trade permit. Not included: refundable or small items, gas permit, water/sewer connection permit application $43, county line work, Annapolis and Maryland state fees, other trade inspections. Lane A 2026-11-09.

Water/sewer provider: Anne Arundel County DPW

LinePrinted ratePrototypeReceipt
Building permit, above $25,000 estimated value (value $380,268 computed per BOCA/ICC valuation data)
permit · computed
$242.00 plus .010 times estimated cost above $25,000.00
valuation
$3,794.68242.00 + 0.010 x (380,268 - 25,000) = 3794.68
Effective 2024-10-01
Source · Permit Fees, Building Permit
fetched 2026-11-09, sha256 9c76b164aff0
Building permit non-refundable application fee
permit
$43.00
flat
$43Printed
Effective 2024-10-01
Source · Permit Fees
fetched 2026-11-09, sha256 9c76b164aff0
Home builder guaranty fund fee, each new home building permit
permit
$50
flat
$50Printed
Effective 2024-10-01
Source · Permit Fees
fetched 2026-11-09, sha256 9c76b164aff0
Electrical permit, new single family detached, 200 amps or less
permit · computed
$147.00
flat
$190147 + 43 application fee = 190.00
Effective 2024-10-01
Source · Permit Fees, Electrical
fetched 2026-11-09, sha256 9c76b164aff0
Plumbing permit, new detached single family dwelling (plus $43.00 application fee)
permit · computed
$173.00
flat
$216Printed 173 + 43 = 216.00
Effective 2024-10-01
Source · Permit Fees, Plumbing
fetched 2026-11-09, sha256 9c76b164aff0
Mechanical permit, residential heating and air conditioning (plus $43.00 application fee)
permit · computed
$121.00
flat
$164Printed 121 + 43 = 164.00
Effective 2024-10-01
Source · Permit Fees, Mechanical
fetched 2026-11-09, sha256 9c76b164aff0
Water capital connection charge per EDU, applications after 6/1/19 (1 EDU assumed)
water
$11,907.00
per EDU
$11,907Printed
Effective 2026-07-01
Source · Utility Fees (July 1, 2026 to June 30, 2027)
fetched 2026-11-09, sha256 af53307dc12b
Wastewater capital connection charge per EDU, applications after 6/1/19 (1 EDU assumed)
sewer
$11,907.00
per EDU
$11,907Printed
Effective 2026-07-01
Source · Utility Fees
fetched 2026-11-09, sha256 af53307dc12b
TAP-Water connection fee
water
$279.00
per tap
$279Printed
Effective 2026-07-01
Source · Utility Fees
fetched 2026-11-09, sha256 af53307dc12b
TAP-Sewer connection fee
sewer
$279.00
per tap
$279Printed
Effective 2026-07-01
Source · Utility Fees
fetched 2026-11-09, sha256 af53307dc12b
Water/Wastewater connection fee
sewer
$51.00
flat
$51Printed
Effective 2026-07-01
Source · Utility Fees
fetched 2026-11-09, sha256 af53307dc12b
Residential roads impact fee, 2,000 - 2,499 sq ft
transportation
$5,991
per dwelling by size band
$5,991Printed
Effective 2026-07-01
Source · Impact Fees (July 1, 2026 to June 30, 2027)
fetched 2026-11-09, sha256 af53307dc12b
Residential schools impact fee, 2,000 - 2,499 sq ft
school
$10,988
per dwelling by size band
$10,988Printed
Effective 2026-07-01
Source · Impact Fees
fetched 2026-11-09, sha256 af53307dc12b
Residential public safety impact fee, 2,000 - 2,499 sq ft
public_safety
$400
per dwelling by size band
$400Printed
Effective 2026-07-01
Source · Impact Fees
fetched 2026-11-09, sha256 af53307dc12b
Total listed$46,259.68

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.