Bossier City, LA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Bossier City Building Permit fees (src 419), Plumbing Permit and inspection fees (src 417), Schedule of Fees - Building Permits (src 416); the documents carry no dates. Under roof 2,400 sq ft assumed. Bossier City charges water/sewer capital improvement assessment (impact) fees only to properties OUTSIDE the city limits on city utilities ($1,326 water and $863 sewer for a 3/4-inch meter), so none is included for an in-city lot. Not included: plumbing fixtures ($6 each, $40 minimum), electrical and mechanical permits, water meter/tap purchase (no amount posted), parish MPC plat fees. Lane A 2026-11-09.
Water/sewer provider: City of Bossier City
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| New residential home building permit permit · computed | $350.00 plus $.15 per square feet under roof base plus per sq ft under roof | $710 | 350 + 0.15 x 2,400 sq ft (under roof incl. garage, assumed) = 710.00 Effective n/a Source · Building Permit fees fetched 2026-11-09, sha256 94e3533a43da |
| Water tap and meter connection inspection, 3/4 through 2-inch water | 35.00 flat | $35 | Printed Effective n/a Source · Plumbing Permit and inspection fees fetched 2026-11-09, sha256 07647e93ee57 |
| 4-inch sewer connection fee, residential sewer | 65.00 flat | $65 | Printed Effective n/a Source · Plumbing Permit and inspection fees fetched 2026-11-09, sha256 07647e93ee57 |
| Sewer inspection, 4-inch sewer | 35.00 flat | $35 | Printed Effective n/a Source · Plumbing Permit and inspection fees fetched 2026-11-09, sha256 07647e93ee57 |
| Total listed | $845 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.