Padstake
Menu

Baton Rouge, LA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. IMPACT FEES VERIFIED ONLY. Included: sewer impact fee (5/8-inch residential meter, 2003 table, src 382) and traffic impact fee (dwelling 2,000-2,999 sq ft, src 383), both linked from the city-parish Permit & Inspection Fees page (brla.gov/2694, src 377). Missing: water connection (water is supplied by a separate company that posts no amount here), sewer tap/connection charge. Posted but left out of this impact-only page: residential new building permit $0.80 per sq ft ($125 minimum), mechanical, electrical, plumbing, gas permits $125 each, occupancy permit $125, technology fee $25. Lane A 2026-11-09.

Water/sewer provider: City of Baton Rouge / Parish of East Baton Rouge

LinePrinted ratePrototypeReceipt
Sewer impact fee, residential 5/8-inch meter (table of increases effective January 1, 2003; still the schedule linked from the Permit & Inspection Fees page)
sewer
$2,150
by meter size
$2,150Printed
Effective n/a
Source · Sewer Impact Fee Schedule
fetched 2026-11-09, sha256 fb04702aeee4
Traffic impact fee, residential dwelling 2,000-2,999 sq ft
transportation
760
per dwelling by size
$760Printed
Effective n/a
Source · Traffic Impact Fee Schedule
fetched 2026-11-09, sha256 070d055bf615

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.