Spring Hill, KS
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: City of Spring Hill, Kansas 2026 Comprehensive Fee Schedule, 1st Edition (springhillks.gov, src 800). Valuation $380,268 by the decided rule (the schedule uses the ICC Building Valuation Data Table). Not included: utility service connection/hook-up fee ($45 per the start-service page) and the sewer connection fee set by resolution, stormwater utility fee ($85 per year), public improvements fee (5% of public improvement cost where applicable), trade permits are included in Table 1-A ("includes all building and building services"). Lane A 2026-11-09.
Water/sewer provider: City of Spring Hill
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Building permit, Table 1-A valuation $100,001.00 to $500,000.00 (valuation $380,268 computed) permit · computed | $1,060.94 for the first $100,000.00 plus $5.80 for each additional $1,000.00 valuation tier | $2,690.74 | 1,060.94 + 5.80 x 281 = 2690.74 Effective 2026-01-01 Source · Comprehensive Fee Schedule 2026, Table 1-A, p. 16 fetched 2026-11-09, sha256 d79ee3a5e7ce |
| Plan review fee, single family and duplex dwellings permit | $25.00 flat | $25 | Printed Effective 2026-01-01 Source · Table 1-B, p. 17 fetched 2026-11-09, sha256 d79ee3a5e7ce |
| Park impact fee, per residential building permit (Ordinance 2005-44) parks | $300.00 per permit | $300 | Printed Effective 2026-01-01 Source · p. 21 fetched 2026-11-09, sha256 d79ee3a5e7ce |
| Water system development charge, 5/8-inch meter (meter and fittings included) water | $ 4,000 per meter, by size | $4,000 | Printed Effective 2026-01-01 Source · p. 9, SHMC 16-111 fetched 2026-11-09, sha256 d79ee3a5e7ce |
| Sewer system development charge, 5/8-inch meter sewer | $ 5,825 per meter, by size | $5,825 | Printed Effective 2026-01-01 Source · p. 11, SHMC 13-212 fetched 2026-11-09, sha256 d79ee3a5e7ce |
| Total listed | $12,840.74 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.