Basehor, KS
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Included: sewer fee $3,450 per unit, parkland fee $300, building permit $1,287.25 on the city valuation rule ($90 per sq ft finished area x 2,000 sq ft = $180,000; Table A $887.25 + $5.00 per additional $1,000), electrical $130, HVAC $95 and plumbing $160 as printed on the city new-dwelling fee estimate (City of Basehor Fee/Permit Schedule, April 2026; the columnar text was read visually and transcribed). Not included: water connection or impact fee (water is supplied by Suburban Water and Consolidated Water District #1, not the city, and no amount is posted), transportation excise tax $0.11 per sq ft of platted property (paid at plat approval), solid waste fee. This page never shows a total. Searched 2026-11-09 (lane A).
Water/sewer provider: City of Basehor
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Sewer fee, new one and two-family dwelling sewer | $3450.00 per unit (inside city limits; outside city limits connection $5,175.00) per unit | $3,450 | Printed Effective 2026-04-01 Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate, New One and Two-Family Dwelling fetched 2026-11-09, sha256 15546b292db3 |
| Parkland fee impact | $300.00 per unit per unit | $300 | Printed Effective 2026-04-01 Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate, New One and Two-Family Dwelling fetched 2026-11-09, sha256 15546b292db3 |
| Building permit, new dwelling (Table A, valuation based) permit · computed | $887.25 for the first $100,000 + $5.00 per additional $1,000 or fraction, to $500,000 valuation 180,000 (city $90.00 per sq ft x 2,000 sq ft finished) | $1,287.25 | 887.25 + 80 x 5.00 = 1,287.25 Effective 2026-04-01 Source · City of Basehor Fee/Permit Schedule, April 2026, Building Valuation; Table A fetched 2026-11-09, sha256 15546b292db3 |
| Electrical permit, new dwelling permit | $130.00 per dwelling | $130 | Printed Effective 2026-04-01 Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate fetched 2026-11-09, sha256 15546b292db3 |
| HVAC permit, new dwelling permit | $95.00 per dwelling | $95 | Printed Effective 2026-04-01 Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate fetched 2026-11-09, sha256 15546b292db3 |
| Plumbing permit, new dwelling permit | $160.00 per dwelling | $160 | Printed Effective 2026-04-01 Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate fetched 2026-11-09, sha256 15546b292db3 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.