Basehor, KS

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Included: sewer fee $3,450 per unit, parkland fee $300, building permit $1,287.25 on the city valuation rule ($90 per sq ft finished area x 2,000 sq ft = $180,000; Table A $887.25 + $5.00 per additional $1,000), electrical $130, HVAC $95 and plumbing $160 as printed on the city new-dwelling fee estimate (City of Basehor Fee/Permit Schedule, April 2026; the columnar text was read visually and transcribed). Not included: water connection or impact fee (water is supplied by Suburban Water and Consolidated Water District #1, not the city, and no amount is posted), transportation excise tax $0.11 per sq ft of platted property (paid at plat approval), solid waste fee. This page never shows a total. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Basehor

LinePrinted ratePrototypeReceipt
Sewer fee, new one and two-family dwelling
sewer
$3450.00 per unit (inside city limits; outside city limits connection $5,175.00)
per unit
$3,450Printed
Effective 2026-04-01
Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate, New One and Two-Family Dwelling
fetched 2026-11-09, sha256 15546b292db3
Parkland fee
impact
$300.00 per unit
per unit
$300Printed
Effective 2026-04-01
Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate, New One and Two-Family Dwelling
fetched 2026-11-09, sha256 15546b292db3
Building permit, new dwelling (Table A, valuation based)
permit · computed
$887.25 for the first $100,000 + $5.00 per additional $1,000 or fraction, to $500,000
valuation 180,000 (city $90.00 per sq ft x 2,000 sq ft finished)
$1,287.25887.25 + 80 x 5.00 = 1,287.25
Effective 2026-04-01
Source · City of Basehor Fee/Permit Schedule, April 2026, Building Valuation; Table A
fetched 2026-11-09, sha256 15546b292db3
Electrical permit, new dwelling
permit
$130.00
per dwelling
$130Printed
Effective 2026-04-01
Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate
fetched 2026-11-09, sha256 15546b292db3
HVAC permit, new dwelling
permit
$95.00
per dwelling
$95Printed
Effective 2026-04-01
Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate
fetched 2026-11-09, sha256 15546b292db3
Plumbing permit, new dwelling
permit
$160.00
per dwelling
$160Printed
Effective 2026-04-01
Source · City of Basehor Fee/Permit Schedule, April 2026, Fee Estimate
fetched 2026-11-09, sha256 15546b292db3

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.