Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$10,214listed total
Nonerank by 2025 new single-family permits

Not included: Included: water capacity charge 3/4-inch meter $4,500 (5/8-inch $3,000), sewer availability fee $3,964 per EDU (1 EDU), water tap-on fee $500, sanitary sewer tap-on fee $650 (3/4-inch meter), residential new construction permit $250 + $0.05 per sq ft x 2,000 sq ft = $350, final grade certification fee $250 (Town of Whiteland Fee Schedule, revised March 2025; a later edition was not found). Not included: cost of water meter and materials (water tap-on is "$500 plus cost of meter and materials", no price posted), other fees in the Code of Ordinances (referred to, not listed). Searched 2026-11-09 (lane A).

Water/sewer provider: Town of Whiteland

LinePrinted ratePrototypeReceipt
Water capacity charge, 3/4-inch meter
impact · computed
$4,500 (5/8-inch $3,000; 1-inch $7,500)
per meter, Phase I/Phase II
$4,500Printed 3/4-inch meter
Effective 2025-03-01
Source · Town of Whiteland Fee Schedule (REV 3.2025), Water Capacity Charge
fetched 2026-11-09, sha256 8c749b8a667e
Sewer availability fee, 1 EDU
impact · computed
$3,964 per EDU
1 EDU (single-family)
$3,9641 x 3,964
Effective 2025-03-01
Source · Town of Whiteland Fee Schedule (REV 3.2025), Sewer Availability Fee
fetched 2026-11-09, sha256 8c749b8a667e
Water tap-on fee, 3/4-inch meter
water
$500 plus cost of meter and materials
per tap
$500Printed $500 (meter and materials not posted)
Effective 2025-03-01
Source · Town of Whiteland Fee Schedule (REV 3.2025), Water Tap-On Fee
fetched 2026-11-09, sha256 8c749b8a667e
Sanitary sewer tap-on fee, 3/4-inch or less meter
sewer
$650
per connection
$650Printed
Effective 2025-03-01
Source · Town of Whiteland Fee Schedule (REV 3.2025), Sanitary Sewer Tap-On Fee
fetched 2026-11-09, sha256 8c749b8a667e
Residential new construction building permit
permit · computed
$250 base + $0.05 per sq ft
2,000 sq ft
$350250 + 0.05 x 2,000 = 350.00 (assumed 2,000 sq ft)
Effective 2025-03-01
Source · Town of Whiteland Fee Schedule (REV 3.2025), Building Permit/Improvement Location Permit
fetched 2026-11-09, sha256 8c749b8a667e
Final grade certification fee
permit
$250
per permit
$250Printed
Effective 2025-03-01
Source · Town of Whiteland Fee Schedule (REV 3.2025), Building Permit/Improvement Location Permit
fetched 2026-11-09, sha256 8c749b8a667e
Total listed$10,214

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.