Greenfield, IN
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Not included: Greenfield IN: posted 2026 road impact fee ($2,121.75, ITE 210 x $225 per trip), park impact fee $1,852, sanitary sewer and water service connection for a 5/8-3/4 inch meter (utility table dated September 13, 2023 on the 2026 sheet), and the improvement location permit at the more-than-one-story rate. NOT included: availability fees paid at plat recording by the developer ($3,150 sewer and $2,150 water per acre, $2,600 electric per lot), electric service connection ($1,000), basement/deck add-ons ($45 each), plan review, school or other fees. Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Road impact fee, single-family detached impact | $2,121.75 per unit (ITE 210, 9.43 trips x $225 per 24-hour trip) | $2,121.75 | Printed Effective 2026-01-01 Source · City of Greenfield Planning and Building Fee Schedule (revised January 9, 2026), Road Impact Fee fetched 2026-11-09, sha256 179d29a40866 |
| Park impact fee, single-family dwelling unit impact | $1,852 per dwelling unit, 2026 amount (2027: $1,945) | $1,852 | Printed Effective 2026-01-01 Source · City of Greenfield Planning and Building Fee Schedule (revised January 9, 2026), Park Impact Fee fetched 2026-11-09, sha256 179d29a40866 |
| Sanitary sewer connection, 5/8-3/4 inch meter sewer | $2,310.00 per meter size, Fees for Utility Connections as of September 13, 2023 | $2,310 | Printed Effective 2023-09-13 Source · City of Greenfield Planning and Building Fee Schedule (revised January 9, 2026), Fees for Utility Connections fetched 2026-11-09, sha256 179d29a40866 |
| Water service connection, 5/8-3/4 inch meter water | $1,990.00 per meter size, Fees for Utility Connections as of September 13, 2023 | $1,990 | Printed Effective 2023-09-13 Source · City of Greenfield Planning and Building Fee Schedule (revised January 9, 2026), Fees for Utility Connections fetched 2026-11-09, sha256 179d29a40866 |
| Improvement location permit / inspection, single family dwelling (more than one story) permit · computed | $345.00 (one story $250.00) per dwelling, highest printed (add $45 each for basement, rear porch or deck, not assumed) | $345 | Highest printed of one story $250.00 and more than one story $345.00 Effective 2026-01-09 Source · City of Greenfield Planning and Building Fee Schedule (revised January 9, 2026), Improvement Location Permit/Inspection Fees fetched 2026-11-09, sha256 179d29a40866 |
| Total listed | $8,618.75 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.