Rockford, IL
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. Water connection and building permit lines from the Rockford 2026 fee schedule. Included: residential permit fee at 0.55% of ICC calculated value (includes all trades), plan review fees, permit processing fee, 1-inch water connection fee and service installation base. Missing: sewer connection or capacity fee (none found in the schedule), service installation per-foot charge ($56 times half the right-of-way width), 10% technology surcharge (applicability to individual lines unclear), $60 child permit fees, impact fees (none in the schedule), school fees. Searched 2026-11-09.
Water/sewer provider: City of Rockford (water)
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Residential new construction permit fee (all trades), 0.55% of calculated construction value permit · computed | 0.55% of ICC calculated value | $2,091.47 | 0.0055 x $380,268 = $2,091.47 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400) Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Permit Fees 1.a p.7 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Building plan review fee, $0.04 per sq ft of building floor area (minimum $70) x 2,000 sq ft permit · computed | $ 0.04 per sq ft | $80 | 0.04 x 2,000 = $80 Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.1 p.5 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Mechanical plan review fee (minimum fee $70; $0.01 per sq ft gives $20) permit | $ 70 minimum fee | $70 | Minimum applies: 0.01 x 2,000 = $20 is below $70 Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.2 p.5-6 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Electrical plan review fee (minimum fee $70; $0.01 per sq ft gives $20) permit | $ 70 minimum fee | $70 | Minimum applies Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.3 p.6 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Plumbing plan review fee (minimum fee $70; $0.01 per sq ft gives $20) permit | $ 70 minimum fee | $70 | Minimum applies Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.6 p.6 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Permit processing fee, each permit issued permit | $ 50 per permit | $50 | Printed Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Section B p.5 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Water connection fee, 1 inch (new services shall be 1 inch or bigger) water | $ 2,572 per 1" service | $2,572 | Printed Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Water Connection Fees F p.25 fetched 2026-11-09, sha256 2d7bfe89af74 |
| Service installation cost, 1 inch (plus $56 per foot times half the right-of-way width, not included) tap | $ 3,830 per 1" service | $3,830 | Printed base Effective 2026-01-01 Source · City of Rockford 2026 Fee Schedule, Service Installation Costs G p.26 fetched 2026-11-09, sha256 2d7bfe89af74 |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199