Padstake
Menu

Rockford, IL

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Water connection and building permit lines from the Rockford 2026 fee schedule. Included: residential permit fee at 0.55% of ICC calculated value (includes all trades), plan review fees, permit processing fee, 1-inch water connection fee and service installation base. Missing: sewer connection or capacity fee (none found in the schedule), service installation per-foot charge ($56 times half the right-of-way width), 10% technology surcharge (applicability to individual lines unclear), $60 child permit fees, impact fees (none in the schedule), school fees. Searched 2026-11-09.

Water/sewer provider: City of Rockford (water)

LinePrinted ratePrototypeReceipt
Residential new construction permit fee (all trades), 0.55% of calculated construction value
permit · computed
0.55%
of ICC calculated value
$2,091.470.0055 x $380,268 = $2,091.47 on computed valuation $380,268 (ICC BVD R-3 V-B 175.92 x 2,000 + U V-B 71.07 x 400)
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Permit Fees 1.a p.7
fetched 2026-11-09, sha256 2d7bfe89af74
Building plan review fee, $0.04 per sq ft of building floor area (minimum $70) x 2,000 sq ft
permit · computed
$ 0.04
per sq ft
$800.04 x 2,000 = $80
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.1 p.5
fetched 2026-11-09, sha256 2d7bfe89af74
Mechanical plan review fee (minimum fee $70; $0.01 per sq ft gives $20)
permit
$ 70
minimum fee
$70Minimum applies: 0.01 x 2,000 = $20 is below $70
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.2 p.5-6
fetched 2026-11-09, sha256 2d7bfe89af74
Electrical plan review fee (minimum fee $70; $0.01 per sq ft gives $20)
permit
$ 70
minimum fee
$70Minimum applies
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.3 p.6
fetched 2026-11-09, sha256 2d7bfe89af74
Plumbing plan review fee (minimum fee $70; $0.01 per sq ft gives $20)
permit
$ 70
minimum fee
$70Minimum applies
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Plan Review Fees C.6 p.6
fetched 2026-11-09, sha256 2d7bfe89af74
Permit processing fee, each permit issued
permit
$ 50
per permit
$50Printed
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Section B p.5
fetched 2026-11-09, sha256 2d7bfe89af74
Water connection fee, 1 inch (new services shall be 1 inch or bigger)
water
$ 2,572
per 1" service
$2,572Printed
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Water Connection Fees F p.25
fetched 2026-11-09, sha256 2d7bfe89af74
Service installation cost, 1 inch (plus $56 per foot times half the right-of-way width, not included)
tap
$ 3,830
per 1" service
$3,830Printed base
Effective 2026-01-01
Source · City of Rockford 2026 Fee Schedule, Service Installation Costs G p.26
fetched 2026-11-09, sha256 2d7bfe89af74

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.