Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Included: sewer connection to wastewater treatment plants ($12,000 per single-family dwelling unit), certificate of occupancy, new-building inspection, building permit application and residential site plan fees (Village Fee Schedule effective April 14 2026). Missing: water connection/tap fees (not in the village fee schedule), and the new single-family permit/plan review calculation is unclear in the schedule (plan review base $100 plus .005 x valuation, minimum $250, applies to categories not clearly one- and two-family new homes), trade permits (residential plumbing base $450 + $10 per fixture, fixture count unknown), so no total. Searched 2026-11-09 (lane A).

Water/sewer provider: Village of Bolingbrook

LinePrinted ratePrototypeReceipt
Connection to wastewater treatment plants, detached single-family dwelling unit
sewer
12,000.00
per dwelling unit
$12,000Printed
Effective 2026-04-14
Source · Bolingbrook Village Fee Schedule (effective April 14, 2026), Sewer Utility
fetched 2026-11-09, sha256 42c56714663a
Certificate of occupancy, residential, per unit
permit
325.00
per unit
$325Printed
Effective 2026-04-14
Source · Bolingbrook Village Fee Schedule (effective April 14, 2026), Buildings and Construction
fetched 2026-11-09, sha256 42c56714663a
Inspection fees, new buildings
permit
80.00
per inspection
$80Printed
Effective 2026-04-14
Source · Bolingbrook Village Fee Schedule (effective April 14, 2026), Buildings and Construction (Inspection fees)
fetched 2026-11-09, sha256 42c56714663a
Building permit application
permit
400.00
each
$400Printed
Effective 2026-04-14
Source · Bolingbrook Village Fee Schedule (effective April 14, 2026), Land Development and Subdivisions
fetched 2026-11-09, sha256 42c56714663a
Residential site plan, foundation survey, grading plan
permit
400.00
each
$400Printed
Effective 2026-04-14
Source · Bolingbrook Village Fee Schedule (effective April 14, 2026), Land Development and Subdivisions
fetched 2026-11-09, sha256 42c56714663a

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.