Padstake
Menu

Eagle, ID

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Impact fees verified only. Included: the City of Eagle water capitalization fee ($8,032 per EDU) and 3/4-inch water meter fee ($723), and the Eagle Sewer District connection fee ($8,916 per equivalent residential unit, effective Dec 1, 2025). Missing: building permit and plan check fees (the city fee schedule refers to a separate ICC valuation-based schedule not found), police/EMS/coroner and fire impact fees, ACHD road impact fee (Ada County Highway District, separate agency), school fees; Valnova and Avimor developments have separate schedules. Searched 2026-11-09.

Water/sewer provider: City of Eagle (water); Eagle Sewer District (sewer)

LinePrinted ratePrototypeReceipt
Water capitalization fee (1 EDU, 3/4-inch meter), non-platted residential due at building permit
water
$8,032.00
per EDU
$8,032Printed; platted lots pay $1,600 at preliminary plat plus $6,432 at final plat (same total)
Effective 2025-12-01
Source · City of Eagle Water Department Rates & Fees (water capitalization fee Resolution 25-04, meter fee, applies to non-platted residential from July 9, 2024)
fetched 2026-11-09, sha256 f1a5d0f26ad4
Water meter fee, 3/4-inch
water
$723.00
per meter
$723Printed
Effective 2025-12-01
Source · City of Eagle Water Department Rates & Fees (water capitalization fee Resolution 25-04, meter fee, applies to non-platted residential from July 9, 2024)
fetched 2026-11-09, sha256 f1a5d0f26ad4
Eagle Sewer District connection fee (sewer permit), 1 equivalent residential unit
sewer
$8,916
per equivalent residential unit
$8,916Printed; effective December 1, 2025; excludes Valnova
Effective 2025-12-01
Source · Eagle Sewer District memo, Connection Fee Increase Effective December 1, 2025 (dated Aug 15, 2025)
fetched 2026-11-09, sha256 940968e97e4f

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.