Padstake
Menu

Sioux Center, IA

Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

$1,675.75listed total
Nonerank by 2025 new single-family permits

Not included: Included: building permit $1,275.75 on the computed ICC valuation $380,268 ($503 for the first $100,000 + $2.75 per additional $1,000), sewer connection $200 and water connection $200 (City of Sioux Center 2024 Permit Fee Schedule, dated 2/17/2025; the sheet is a one-page spreadsheet). No impact fee is posted. Not included: refundable building permit deposit (25% of the permit fee), sewer lift $275 where applicable, meter box (no charge), plan review. Searched 2026-11-09 (lane A).

Water/sewer provider: City of Sioux Center

LinePrinted ratePrototypeReceipt
Building permit, new house (valuation based)
permit · computed
$503.00 for the first $100,000 plus $2.75 for each additional $1,000
valuation 380,268 (ICC convention)
$1,275.75503.00 + 281 x 2.75 = 1,275.75; valuation 380,268 = 175.92 x 2,000 + 71.07 x 400
Effective 2025-02-17
Source · City of Sioux Center 2024 Permit Fee Schedule (dated 2/17/2025), Building Permit Fee
fetched 2026-11-09, sha256 b6eaaa497c2e
Sewer connection
sewer
$200.00 each
per connection
$200Printed
Effective 2025-02-17
Source · City of Sioux Center 2024 Permit Fee Schedule (dated 2/17/2025), Other Possible Fees
fetched 2026-11-09, sha256 b6eaaa497c2e
Water connection
water
$200.00 each (customer runs water from street or stub)
per connection
$200Printed
Effective 2025-02-17
Source · City of Sioux Center 2024 Permit Fee Schedule (dated 2/17/2025), Other Possible Fees
fetched 2026-11-09, sha256 b6eaaa497c2e
Total listed$1,675.75

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.