Winder, GA
Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.
Impact fees verified. Not a full total. System development charges verified from the City of Winder Water & Sewer Rates page (effective Aug 1, 2026): water SDC $3,289 (5/8-3/4 inch line) and sewer SDC $3,281 (4-inch connection, 1 ERU = 244 gpd). The same tables show city-installed connection charges ($5,000 water full connection; sewer stub $5,000 full connection that includes one ERU, tap $2,253) whose overlap with the SDC is not clear from the page, so they are NOT added. NOT included: building permit fees (page says $8 per $1,000 of construction value in search results; the fee schedule page returned 404 to us), meter, deposit, Barrow County fees apply to parcels outside the city. Page never shows a total. 2026-11-09.
Water/sewer provider:
| Line | Printed rate | Prototype | Receipt |
|---|---|---|---|
| Water system development charge (SDC) water | $3,289 per 5/8 - 3/4 inch line (1 ERU) | $3,289 | Printed Effective 2026-08-01 Source · City of Winder Water & Sewer Rates, effective August 1, 2026, Water Connection Fee, Table 6 fetched 2026-11-09, sha256 46fd8eab56ad |
| Sewer system development charge (SDC) sewer | $3,281 per 4 inch sewer connection (1 ERU = 244 gpd) | $3,281 | Printed Effective 2026-08-01 Source · City of Winder Water & Sewer Rates, effective August 1, 2026, Sewer Connection Fee, Table 5 fetched 2026-11-09, sha256 46fd8eab56ad |
Fee-change calendar
- None recorded
Need the full report for a parcel?
The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199
Delivered as a web page and PDF within 1 business day.
Watch this jurisdiction
Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.