Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. System development charges verified from the City of Winder Water & Sewer Rates page (effective Aug 1, 2026): water SDC $3,289 (5/8-3/4 inch line) and sewer SDC $3,281 (4-inch connection, 1 ERU = 244 gpd). The same tables show city-installed connection charges ($5,000 water full connection; sewer stub $5,000 full connection that includes one ERU, tap $2,253) whose overlap with the SDC is not clear from the page, so they are NOT added. NOT included: building permit fees (page says $8 per $1,000 of construction value in search results; the fee schedule page returned 404 to us), meter, deposit, Barrow County fees apply to parcels outside the city. Page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water system development charge (SDC)
water
$3,289
per 5/8 - 3/4 inch line (1 ERU)
$3,289Printed
Effective 2026-08-01
Source · City of Winder Water & Sewer Rates, effective August 1, 2026, Water Connection Fee, Table 6
fetched 2026-11-09, sha256 46fd8eab56ad
Sewer system development charge (SDC)
sewer
$3,281
per 4 inch sewer connection (1 ERU = 244 gpd)
$3,281Printed
Effective 2026-08-01
Source · City of Winder Water & Sewer Rates, effective August 1, 2026, Sewer Connection Fee, Table 5
fetched 2026-11-09, sha256 46fd8eab56ad

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.