Prototype: 2,000 sq ft single-family detached, 3 bed / 2 bath, 3/4-inch water meter, 400 sq ft garage.

Impact fees verifiedno total: permit and tap fees not posted
Nonerank by 2025 new single-family permits

Impact fees verified. Not a full total. Statesboro FY2027 schedule: 3/4-inch water tap $1,465 and 4-inch sewer tap $1,200 (inside city limits; outside city limits higher), new single-family building permit $0.46 per sq ft (2,000 sq ft heated assumed; the schedule says "per Square Footage", garage treatment not stated) plus 5% plan review. No city impact fee appears in the schedule (only a DRI surcharge), so no impact fee lines. NOT included: required inspections (excluded from the permit rate), trade permits, meter deposits, Bulloch County fees for parcels outside the city. Taps and permit only, so this is not a complete total; page never shows a total. 2026-11-09.

Water/sewer provider:

LinePrinted ratePrototypeReceipt
Water tap fee inside city limits, 3/4 inch
water
$1,465.00
per 3/4 inch tap
$1,465Printed
Effective 2024-07-01
Source · City of Statesboro, Georgia FY 2027 Schedule of Rates, Fees & Fines (adopted), Water Tap Fees Inside City Limits
fetched 2026-11-09, sha256 86128a3bd96b
Sewer tap fee inside city limits, 4 inch
sewer
$1,200.00
per 4 inch tap
$1,200Printed
Effective 2024-07-01
Source · City of Statesboro, Georgia FY 2027 Schedule of Rates, Fees & Fines (adopted), Sewer Tap Fees Inside City Limits
fetched 2026-11-09, sha256 86128a3bd96b
Single-family residential new construction building permit
permit · computed
$0.46 per Square Footage
per sq ft
$920$0.46 x 2,000 sq ft heated (assumed; fee excludes inspections and plan review) = 920.00
Effective undated
Source · City of Statesboro, Georgia FY 2027 Schedule of Rates, Fees & Fines (adopted), Building Permits (2024 House Bill 461)
fetched 2026-11-09, sha256 86128a3bd96b
Plan review fee
permit · computed
5% of Building Permit Fee
percent of permit fee
$465% x 920.00 = 46.00
Effective undated
Source · City of Statesboro, Georgia FY 2027 Schedule of Rates, Fees & Fines (adopted), Building Permits
fetched 2026-11-09, sha256 86128a3bd96b

Fee-change calendar

Need the full report for a parcel?

The Site Cost Report adds the parcel's water and sewer provider, capacity notes and nearby site-work prices. Buy this report, $199

Delivered as a web page and PDF within 1 business day.

Watch this jurisdiction

Get an alert when this fee schedule changes, a future increase is adopted, or a capacity notice starts, changes or lifts. Alert delivery opens with the paid plan; your signup is stored now.